USA flag logo/image

An Official Website of the United States Government

DESIGN

Award Information

Agency:
Department of Energy
Branch:
N/A
Award ID:
3477
Program Year/Program:
1986 / SBIR
Agency Tracking Number:
3477
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
August Systems Inc
18277 Sw Boones Ferry Rd Tigard, OR 97224
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 1
Fiscal Year: 1986
Title: DESIGN
Agency: DOE
Contract: N/A
Award Amount: $49,925.00
 

Abstract:

THE OBJECT OF THIS RESEARCH IS THE DESIGN OF A CONTROL AND PROTECTION SYSTEM THAT CAN EXHIBIT HIGH RELIABILITY THROUGH THE USE OF FAULT TOLERANCE. WHILE MANY FAULT TOLERANT COMPUTER SYSTEMS HAVE BEEN DEVELOPED, AN INTEGRATED SYSTEMS APPROACH DEMANDS THAT OTHER FACTORS MUST BE INCLUDED. WE ARE PARTICULARLY CONCERNED WITH THE INTERFACES BETWEEN THE VARIOUS SUBSYSTEMS OR ELEMENTS OF THE TOTAL SYSTEM. THE NECESSARY PROPERTIES TO ACHIEVE FAULT TOLERANCE ARE: ALL ERRORS MUST BE DETECTED AND CORRECTED, ALL NOMINALLY INDEPENDENT SYSTEMS MUST BE ISOLATED TO THE EXTENT THAT ERRORS OR OTHER FAULTS IN THEM CANNOT DISTURB THE PERFORMANCE OF THE OTHER ELEMENTS OR SUBSYSTEMS; AND EACH SUBSYSTEM MUST BE ABLE TO DETECT THE STATUS OF OTHER SUBSYSTEMS SO THAT IT MAY DETERMINE IF THAT SUBSYSTEM IS IN A FAULT-FREE STATE, OR IS IN A STATE WHEREBY A FAULT EXISTS BUT HAS BEEN PROPERLY HANDLED, OR IS IN A STATE WHERE A FAULT OR MULTIPLE FAULTS EXIST THAT DISABLE THE PARTICULAR SUBSYSTEM. THE APPROACH USED IS ONE OF HIERARCHICAL ABSTRACTION. AT THE TOP LEVEL OF THE HIERARCHY THE PERFORMANCE GOALS AND RELIABILITY GOALS OF THE TARGET SYSTEM ARE SPECIFIED. AT THE NEXT LEVELS, EACH SUBSYSTEM WILL BE DEFINED IN TERMS OF ITS GOALS AND THE INTERCONNECTION BETWEEN THEM WILL BE EXAMINED. AT EACH SUBSEQUENT SUBLEVEL OF THE HIERARCHY, THE SUBSUBSYSTEM SPECIFICATION AND INTERCONNECTION WILL BE EXAMINED TO ACHIEVE THE GOALS OF THE HIGHER LEVEL SUBSYSTEM. THE DEVELOPMENT OF VALIDATION TECHNIQUES IS ESSENTIAL IF SUCH SYSTEMS ARE TO BE USED. THE PARTICULAR VALIDATION TECHNIQUE THAT IS PROPOSED RESTS HEAVILY ON THE HIERARCHICALDEISGN TECHNIQUE DESCRIBED ABOVE.

Principal Investigator:

John h. wensley
PRINCIPAL INVESTIGATOR
5036843550

Business Contact:

Small Business Information at Submission:

August Systems, Inc.
18277 Sw Boones Ferry Rd. Tigard, OR 97224

EIN/Tax ID:
DUNS: N/A
Number of Employees: N/A
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No