USA flag logo/image

An Official Website of the United States Government

Company Information:

Company Name:
Eddins-earles
Address:
89 Lee Drive
Concord, MA 01742
Phone:
N/A
URL:
N/A
EIN:
N/A
DUNS:
N/A
Number of Employees:
2
Woman-Owned?:
Yes
Minority-Owned?:
No
HUBZone-Owned?:
No

Commercialization:

Has been acquired/merged with?:
N/A
Has had Spin-off?:
N/A
Has Had IPO?:
N/A
Year of IPO:
N/A
Has Patents?:
N/A
Number of Patents:
N/A
Total Sales to Date $:
$ 0.00
Total Investment to Date $
$ 0.00
POC Title:
N/A
POC Name:
N/A
POC Phone:
N/A
POC Email:
N/A
Narrative:
N/A

Award Totals:

Program/Phase Award Amount ($) Number of Awards
SBIR Phase I $84,329.00 2
SBIR Phase II $73,660.00 1

Award List:

DEVELOPMENT OF A SOFTWARE COST ESTIMATION MODEL FOR THE CONCEPTUALIZATION\FORMULATIN STAGES

Award Year / Program / Phase:
1983 / SBIR / Phase I
Award Amount:
$24,835.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Abstract:
N/a

DEVELOPMENT OF A SOFTWARE COST ESTIMATION MODEL FOR THE CONCEPTUALIZATION\FORMULATIN STAGES

Award Year / Program / Phase:
1984 / SBIR / Phase II
Award Amount:
$73,660.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Abstract:
This research proposes to conceptually design a parametric model and an associated interactive computer program that will accurately estimate the cost of softwae in computer embedded in ai force c3 i systems. the model will be based on the relationships between cost,the number of executable sourceā€¦ More

Automated Methodology for Balancing Avionics Requirements and LCC

Award Year / Program / Phase:
1995 / SBIR / Phase I
Award Amount:
$59,494.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Donald R. Earles
Abstract:
A multilevel integrated methodology for trading avionics suite performance requirements and life cycle costs will be designed and demonstrated. This methodology will employ computerized spreadsheets with correlating databases. The databases to be used will be structured from the informationā€¦ More