You are here
ENSCO Inc
UEI: N/A
# of Employees: N/A
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
GENERALIZED BEAMFORMING FOR AUTOMATIC ASSOCIATION
Amount: $49,958.00N/A
SBIRPhase I1990Department of Defense Air Force -
METEOROLOGICAL MONITORING SYSTEM
Amount: $49,954.00N/A
SBIRPhase I1990National Aeronautics and Space Administration -
STATISTICAL PROCEDURES FOR DETERMINING COMPLIANCE WITH YIELD THRESHOLD NUCLEAR TEST LIMITATIONS
Amount: $245,411.00IN VIEW OF THE RECENT DEVELOPMENT OF UNIFIED MAGNITUDE MEASURES FOR SEISMIC ESTIMATION OF THE YIELDS OF NUCLEAR EXPLOSIONS THE STATISTICAL PROCEDURES FOR VERIFYING COMPLIANCE WITH TEST BAN TREATIES WI ...
SBIRPhase II1989Department of Defense Defense Advanced Research Projects Agency -
CHARACTERIZING SEISMIC EVENTS USING ARTIFICIAL NEURAL SYSTEMS
Amount: $49,990.00THIS STUDY WILL INVESTIGATE THE FEASIBILITY OF APPLYING NEURAL NETWORK METHODS FOR THE EXTRACTION OF SEISMIC WAVEFORM CHARACTERISTICS AND THE IDENTIFICATION OF SEISMIC EVENTS. THE SPECIFIC OBJECTIVES ...
SBIRPhase I1989Department of Defense Defense Advanced Research Projects Agency -
KNOWLEDGE BASED SEISMIC EVENT IDENTIFICATION USING SEISMIC ANALYSIS CASE KNOWLEDGE AND EXPLANATIONS
Amount: $49,992.00THIS STUDY WILL INVESTIGATE THE APPLICABILITY OF CASE-BASED REASONING TO THE DOMAIN OF SEISMIC EVENT IDENTIFICATION FOR MONITORING TESTBAN TREATIES. A SEISMIC IDENTIFICATION DECISION SUPPORT TOOL WILL ...
SBIRPhase I1989Department of Defense Defense Advanced Research Projects Agency -
KENNEDY SPACE CENTER ATMOSPHERIC BOUNDARY LAYER EXPERIMENT
Amount: $474,000.00SINCE THE KENNEDY SPACE CENTER (KSC) IS LOCATED IN A COASTALENVIRONMENT WITH SEVERAL DIFFERENT LAND/WATER INTERFACES, COMPLEX AND UNIQUE LOW-LEVEL CIRCULATION PATTERNS ARE OBSERVED THROUGHOUT THE YEAR ...
SBIRPhase II1988National Aeronautics and Space Administration -
KENNEDY SPACE CENTER ATMOSPHERIC BOUNDARY LAYER EXPERIMENT
Amount: $50,000.00N/A
SBIRPhase I1988National Aeronautics and Space Administration -
STATISTICAL PROCEDURES FOR DETERMINING COMPLIANCE WITH YIELD THRESHOLD NUCLEAR TEST LIMITATIONS
Amount: $48,953.00N/A
SBIRPhase I1988Department of Defense Defense Advanced Research Projects Agency -
A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN
Amount: $48,214.00A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEF ...
SBIRPhase I1987Department of Energy -
THE FEASIBILITY OF UTILIZING CEPSTRAL ANALYSIS (POWER AND/ORCOMPLEX) IN HELICOPTER GEARBOX BEARING DIAGNOSTICS IS EXAMINED.
Amount: $39,000.00THE FEASIBILITY OF UTILIZING CEPSTRAL ANALYSIS (POWER AND/ORCOMPLEX) IN HELICOPTER GEARBOX BEARING DIAGNOSTICS IS EXAMINED. VIBRATION SIGNATURES ARE EXAMINED FOR DETERMINATION OF WEAR OVER TIME. DATA ...
SBIRPhase I1985National Science Foundation