USA flag logo/image

An Official Website of the United States Government

THE DEVELOPMENT OF AN AUTOMATED CUP INSPECTION MODULE IS PROPOSED.

Award Information

Agency:
Department of Defense
Branch:
Army
Award ID:
3916
Program Year/Program:
1986 / SBIR
Agency Tracking Number:
3916
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
Flow Research Inc
21414 - 68th Avenue South Kent, WA 98032
View profile »
Woman-Owned: No
Minority-Owned: Yes
HUBZone-Owned: No
 
Phase 1
Fiscal Year: 1986
Title: THE DEVELOPMENT OF AN AUTOMATED CUP INSPECTION MODULE IS PROPOSED.
Agency / Branch: DOD / ARMY
Contract: N/A
Award Amount: $49,965.00
 

Abstract:

THE DEVELOPMENT OF AN AUTOMATED CUP INSPECTION MODULE IS PROPOSED. THE OBJECTIVES OF THE PHASE I EFFORT ARE TO ESTABLISHED THE PARAMETERS WHICH MUST BE MEASURED AND THEIR REQUIRED RESOLUTION. THE PARAMETERS INCLUDE HARDNESS, OUTSIDE AND INSIDE DIAMETERS, BASE THICKNESS, TOTAL LENGTH, AND WALL THICKNESS. IN PHASE I, THE MEASUREMENT CONCEPTS WILL BE MOCKED-UP AND DYNAMICALLY TESTED TO VERIFY THEIR GAUGING ACCURACIES. LABORATORY TESTING WILL PROVIDE THE NECESSARY DATA TO CONFIRM THE CONCEPTUAL DESIGN AND LATER COMPLETE A DETAIL DESIGN. BASED ON THE PHASE I RESULTS, A PHASE II DEVELOPMENT EFFORT WILL DEVELOP A DETAILED CUP INSPECTION SYSTEM DESIGN AND THEN FABRICATE, ASSEMBLE, AND TEST THE SYSTEM.

Principal Investigator:

Philip bondurant
2068728500

Business Contact:

Small Business Information at Submission:

Flow Research Co
21414 - 68th Ave S Kent, WA 98032

EIN/Tax ID:
DUNS: N/A
Number of Employees:
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No