ENHANCED EGRESS REQUIREMENTS NECESSITATES A RATE OF ADVANCE OF 80 FT/HR FOR…

Award Information

Agency:
Department of Defense
Branch:
Air Force
Award ID:
3930
Program Year/Program:
1986 / SBIR
Agency Tracking Number:
3930
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
FOSTER-MILLER, INC.
350 Second Ave. Waltham, MA 02451
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 1
Fiscal Year: 1986
Title: ENHANCED EGRESS REQUIREMENTS NECESSITATES A RATE OF ADVANCE OF 80 FT/HR FOR BOTH A BORING MACHINE AND GROUND SUPPORT LINING SYSTEM.
Agency / Branch: DOD / USAF
Contract: N/A
Award Amount: $68,905.00
 

Abstract:

ENHANCED EGRESS REQUIREMENTS NECESSITATES A RATE OF ADVANCE OF 80 FT/HR FOR BOTH A BORING MACHINE AND GROUND SUPPORT LINING SYSTEM. THIS ADVANCE RATE IS BEYOND THE CURRENT TECHNICAL FEASIBILITY OF ALL STATE-OF-THE-ART LINING SYSTEMS. AN INNOVATIVE PRESSURIZED LINING SYSTEM USING A POLYMERIC MATERIAL IS PRESENTED WHICH WILL MEET BOTH THE STRUCTURAL, AS WELL AS, OPERATIONAL REQUIREMENTS OF THE EGRESS OPERATION. THE RAPID LINING SYSTEM POSSESSES A MECHANICAL SIMPLICITY AND OPERATIONAL PROCESS WHICH ALLOWS FOR CONTINUOUS, REMOTE CONTROL OF THE HARDWARE. THE LINING SYSTEM, AS CONCEIVED, WILL BE ADAPTABLE TO ANY EGRESS BORING MACHINE AND WOULD NOT INTERFER WITH ANY MUCK HANDLING SCHEME. PHASE I WILL EXAMINE KEY TECHNICAL ISSUES INCLUDING LINING MATERIAL EVALUATION, DISTRIBUTION UNDER PRESSURE, DEVELOPMENT OF A CONCEPTUAL DESIGN AND EVALUATION OF MAJOR HARDWARE SYSTEMS.

Principal Investigator:

Robert n torbin
6178903200

Business Contact:

Small Business Information at Submission:

Foster-miller Inc
350 Second Ave Waltham, MA 02254

EIN/Tax ID:
DUNS: N/A
Number of Employees:
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No