USA flag logo/image

An Official Website of the United States Government

INTEGRATING A COST ARCHITECTURE METHODOLOGY WITHIN A DYNAMIC WORK STATION…

Award Information

Agency:
Department of Defense
Branch:
Air Force
Award ID:
14931
Program Year/Program:
1992 / SBIR
Agency Tracking Number:
14931
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
Frontier Technology, Inc.
75 Aero Camino, Suite A Goleta, CA 93117-
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 2
Fiscal Year: 1992
Title: INTEGRATING A COST ARCHITECTURE METHODOLOGY WITHIN A DYNAMIC WORK STATION ENVIRONMENT
Agency / Branch: DOD / USAF
Contract: N/A
Award Amount: $513,700.00
 

Abstract:

THE PROPOSED PROJECT WILL DESIGN A SOUP-TO--NUTS COST ANALYSIS METHODOLOGY AUTOMATED WITHIN A USER-FRIENDLY COMPUTER WORK STATION ENVIRONMENT. THE TOOLS AVAILABLE VIA THE WORKSTATION WILL BE CAPABLE OF ASSESSING THE IMPACT THAT DOD BUDGETS AND FORCE STRUCTURE DECISIONS HAVE ON SYSTEM COSTS AND SYSTEM AFFORDABILITY. AT THE OPPOSITE END OF THE SPECTRUM OF COSTING CAPABILITY, TOOLS WILL BE AVAILABLE THAT CAN GENERATE DETAILED UNIT COSTS WITH A COMPLETE COMPONENT COST BUILD-UP WHEN PROVIDED DETAILED SYSTEM DESIGN DATA. IN THE MIDDLE GROUND AREA OF COSTING CAPABILITY ARE TOOLS THAT WILL ENABLE THE DESIGN ENGINEER, ALONG WITH THE COST ANALYST, TO DETERMINE THE IMPACTS THAT UPPER-LEVEL DESIGN PARAMETER TRADE-OFFS HAVE ON A SYSTEM COSTS. FOR THE FIRST TIME, THE PRELIMINARY DESIGNER CAN INVESTIGATE THE SENSITIVITY THAT DESIGN PARAMETERS HAVE ON NOT ONLY AIRCRAFT WEIGHT, PERFORMANCE, AND EFFECTIVENESS, BUT ALSO ON AIRCRAFT COSTS. ENPHASIS WILL BE PLACED ON ESTIMATING THE COSTS ASSOCIATED WITH INNOVATLNG NEW TECHNOLOGIES INTO ADVANCE WEAPON SYSTEMS. PHASE I WILL ESTABLISH SOUND AND REASONABLE REQUIREMENTS FOR THE COST ESTIMATING METHODOLOGY. BASED UPON THE REQUIREMENTS, A FUNCTIONAL DESIGN WILL BE DEVELOPED. CANDIDATE COST MODELS FOR SATISFYXNG THE FUNCTIONAL DESIGN WILL BE SURVEYED. AN UPPER LEVEL SPEC WILL BE DEVELOPED. AS A LAST TASK, A DRAFT DEVELOPMENT PLAN WILL BE GENERATED, IDENTIFYING REQUIRED MODEL MODIFICATIONS, MODEL INTEGRATIONS AND REQUIRED NEW METHODOLOGY DEVELOPMENT. COMPLETION OF PHASE I ENSURES THAT ALL ASPECTS OF THE PROBLEM HAVE BEEN THOROUGHLY RESEARCHED AND RESOLVED TO MINIMIZE RISK, SO THAT A PHASE II DETAILED SYSTEM DESIGN AND A DEVELOPMENT/PROCUREMENT PLAN CAN BE GENERATED.

Principal Investigator:

John Denelsbeck
Principal Investigator
5134293302

Business Contact:

Small Business Information at Submission:

Frontier Technology Inc.
4141 Col Glenn Hwy Suite 140 Beavercreek, OH 45431

EIN/Tax ID:
DUNS: N/A
Number of Employees:
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No