You are here
Horine Engineers, Inc.
UEI: N/A
# of Employees: 2
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Electromagnetic Shielding for Composite Shelters
Amount: $51,403.00The weakest link in the shielding protection for a current shelter is at the door seam. For the proposed shelter, the door seam will be shielded with a "Pressure Stabilized Gasket System" that was des ...
SBIRPhase I1993Department of Defense Air Force -
REFORMING RADIO FREQUENCY DOOR GASKETS
Amount: $53,787.00THE ARMY IS USING WIRE MESH COVERED ELASTOMERIC CORE GASKET FOR SHIELDING DOORS SUBJECTED TO EM RADIATION. ALTHOUGH SHIELDING EFFECTIVENESS MEETS SPECIFICATIONS WHEN THE GASKETS ARE NEW, THEY LOSE THE ...
SBIRPhase I1991Department of Defense Army -
IMPROVED GASKET MATERIALS
Amount: $49,818.00IT IS PROPOSED TO ESTABLISH THE FEASIBILITY, AND PREPARE A PROTOCOL FOR SYNTHESIZING AND FORMULATING A NEW IMPROVED SILICONE ELASTOMER MATERIAL FOR USE IN ARMY WEAPONRY PACKAGING. THIS MATERIAL WILL H ...
SBIRPhase I1987Department of Defense Army -
IT IS PROPOSED TO SURVEY AVAILABLE INFORMATION ON THE NUMBER OF OPERATORS AND THE DEGREE TO WHICH THEY ARE EXPOSED AT ARMY MUNITIONS PLANTS.
Amount: $48,866.00IT IS PROPOSED TO SURVEY AVAILABLE INFORMATION ON THE NUMBER OF OPERATORS AND THE DEGREE TO WHICH THEY ARE EXPOSED AT ARMY MUNITIONS PLANTS. THIS INFORMATION WILL BE SCREENED AND ASSESSED TO DETERMINE ...
SBIRPhase I1986Department of Defense Army -
MUNITIONS CONTAINERS
Amount: $28,000.00THIS PROPOSAL PRESENTS A PLAN FOR STUDYING THE FEASIBILITY OF AN INNOVATIVE AUTOMATIC INERT GAS PRESSURIZATION METHOD AND NEW GASKET MATERIALS THAT WILL INCREASE THE SERVICE LIFE OF MUNITIONS WHILE IN ...
SBIRPhase I1984Department of Defense Air Force