USA flag logo/image

An Official Website of the United States Government

A 100 GIGAHERTZ ACQUISITION OF BUNCH PROFILE, POSITION, AND ARRIVAL TIME FOR…

Award Information

Agency:
Department of Energy
Branch:
N/A
Award ID:
21097
Program Year/Program:
1993 / SBIR
Agency Tracking Number:
21097
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
HYPRES. Inc.
175 Clearbrook Road Elmsford, NY 10523-
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 1
Fiscal Year: 1993
Title: A 100 GIGAHERTZ ACQUISITION OF BUNCH PROFILE, POSITION, AND ARRIVAL TIME FOR PARTICLE ACCELERATOR DIAGNOSTICS AND CONTROL
Agency: DOE
Contract: N/A
Award Amount: $74,790.00
 

Abstract:

THIS PROJECT WILL DEVELOP AN ACQUISITION SYSTEM THAT CAN CAPTURE EERY SUPERCONDUCTING SUPER COLLIDER (SSC) BEAM BUNCH AND MEASURE IN REAL-TIME: BEAM CURRENT PROFILE CAPTURED AT 100 GIGASAMPLES (GS)/S WITH 6-BITS OF RESOLUTION, BUNCH TIME OF ARRIVAL TO 10 PS RELATIVE TO A SYNCHRONIZED MASTER CLOCK, AND BEAM POSITION TO 25 MICRONS EVERY 10 PS. THE SYSTEM USES PICKUP COILS ALONG THE BEAM AXIS. ONE SET OF PICKUP COILS IS CONNECTED TO A SUPERCONDUCTING 100 GHZ DIGITIZER WHICH WILL ACQUIRE 24 SAMPLES OF 4-BIT DELTAS REPRESENTING THE CHANGE OF CURRENT INDUCED IN THE PICKUP COIL BY A BEAM BUNCH. TWO MORE IDENTICAL DIGITIZERS ARE CONNECTED TO DIFFERENTIAL X AND Y AXIS PICKUP COILS. THESE WILL ACQUIRE 24 SAMPLES EACH REPRESENTING THE CHANGE IN POSITION OF THE BEAM CURRENT BUNCH WITH A 25 MICRON RESOLUTION EVERY 10 PS, AND THUS WILL MEASURE DEVIATION WITHIN A BUNCH. A SEPARATE CIRCUIT WILL

Principal Investigator:

Dr Sergey Rylov
9145921190

Business Contact:

Small Business Information at Submission:

Hypres Inc.
175 Clearbrook Rd Elmsford, NY 10523

EIN/Tax ID:
DUNS: N/A
Number of Employees: N/A
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No