You are here

Integrated Systems I

Company Information
Address
201 Moffett Park
Sunnyvale, CA 94089
United States



Information

UEI: N/A

# of Employees: N/A


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. Graphical Interactive Control Design and Implementation Environment

    Amount: $48,152.00

    N/A

    SBIRPhase I1993National Aeronautics and Space Administration
  2. HIDDEN MARKOV MODELING FOR INTELLIGENT CONTROL OF INDUSTRIAL PROCESSES

    Amount: $50,000.00

    THE PRINCIPAL OBJECTIVE OF PHASE I IS DEVELOPMENT OF METHODS FOR OBTAINING PROCESS MODELS FROM IN-SITU AND POSTMORTEM MEASUREMENTS THAT CAN BE USED FOR EITHER QUALITY CONTROL OR FEEDBACK CONTROL. A NO ...

    SBIRPhase I1992Department of Energy
  3. SYSTEM IDENTIFICATION FOR ROBUST CONTROL DESIGN

    Amount: $49,994.00

    THE OBJECTIVE OF THE PRESENT PROPOSAL IS THE DEVELOPMENT OF SOME MATHEMATICAL AND COMPUTATIONAL TOOLS THAT ARE APPROPRIATE TO THE NEXT GENERATION OF CACSD (COMPUTER AIDED CONTROL SYSTEM DESIGN) ENVIRO ...

    SBIRPhase I1992National Science Foundation
  4. CONTROL OF INDUSTRIAL PROCESSES VIA CONVEX OPTIMIZATION

    Amount: $66,828.00

    N/A

    SBIRPhase I1992Department of Defense Defense Advanced Research Projects Agency
  5. ADVANCED TRACKING AND ADAPTIVE POINTING CONTROL MODULE

    Amount: $499,039.00

    ADVANCED GUN POINTING AND STABILIZATION SYSTEMS FOR BOTH ROTORCRAFT AND FIGHTING VEHICLE BASED WEAPONS REQUIRE THE INTEGRATION OF COMPLEX TARGET LEAD PREDICTION ALGORITHMS, NONLINEAR ADAPTIVE STRATEGI ...

    SBIRPhase II1990Department of Defense Army
  6. ROBUST ADAPTIVE CONTROL OF LARGE SPACE STRUCTURES

    Amount: $485,240.00

    THE OBJECTIVE OF THE PRESENT PROPOSAL IS THE DEVELOPMENT OF EFFICIENT TECHNIQUES FOR SYSTEM IDENTIFICATION AND ADAPTIVE CONTROL OF LARGE SPACE STRUCTURES (LSS). MANY OF THE ENVISIONED FUTURE SPACE MIS ...

    SBIRPhase II1990National Aeronautics and Space Administration
  7. LOW-COST MODULAR SECONDARY-INJECTION THRUST VECTOR CONTROL FOR SOUNDING ROCKETS

    Amount: $240,000.00

    ADDITION OF TVC COULD EASILY DOUBLE THE COST OF SOUNDING ROCKETS UNLESS DESIGN FEATURES THAT LIMIT COST GROWTH ARE INCORPORATED. ALSO, THE DESIGN OF THE TVC SUBSYSTEM MUST BE MODULAR AND SELF-CONTAINE ...

    SBIRPhase II1990Department of Defense Air Force
  8. CONTROL STRUCTURE INTERACTION (CSI): OPTIMIZATION BASED DESIGN TOOLS

    Amount: $50,000.00

    MANY ENVISIONED MISSIONS FOR LARGE-SPACE-STRUCTURES (LSS) MUST SATISFY STRINGENT PERFORMANCE DEMANDS, AND HENCE, WILL REQUIRE SOME COMBINATION OF ACTIVE AND PASSIVE CONTROL. IT IS PROPOSED THAT THESE ...

    SBIRPhase I1990National Aeronautics and Space Administration
  9. SYSTEM ID TOOLS FOR CSI

    Amount: $130,000.00

    N/A

    SBIRPhase II1990Department of Defense Air Force
  10. NUMERICAL OPTIMIZATION OF SINGLE-STAGE-TO-ORBIT CONFIGURATION WITH INEQUALITY CONSTRAINTS

    Amount: $49,948.00

    THE OBJECTIVE OF THIS PROPOSAL IS TO PERFORM NUMERICAL OPTIMIZATION OF HYPERSONIC BODY CONFIGURATIONS APPLICABLE TOSINGLE-STAGE-TO-ORBIT AEROSPACE PLANE CONFIGURATIONS. FORMAL OPTIMIZATION OF HIGH-SPE ...

    SBIRPhase I1989National Aeronautics and Space Administration
US Flag An Official Website of the United States Government