INCLINED BLIND RAISE TUNNEL LINING - INSPECTION AND CONTROL
Agency / Branch:
DOD / USAF
Contract:
N/A
Award Amount:
$60,754.00
Abstract:
THE BLIND RAISE TUNNEL LINING REQUIRES THAT HIGH SPEED AUTOMATED APPLICATION OF THE LINING MATERIAL BE MADE. AN IMPORTANT ASPECT OF THE TUNNEL LINING PROCESS IS A RELIABLE INSPECTION AND CONTROL SUBSYSTEM THAT WOULD ENSURE THAT THE LINING SATISFY THE CRITERIA ESTABLISHED. IN THIS PROPOSAL, DETAILED DISCUSSIONS OF THE REQUIREMENT FOR SETTING INSPECTION AND CONTROL SUBSYSTEM DESIGN GUIDELINES ARE MADE, PRELIMINARY CONCEPTUAL DESIGN OF AN EXPERT SYSTEM IS PRESENTED, AND THE KEY ISSUES ON THE EVALUATION OF THE SUBSYSTEM IS DESCRIBED.