You are here

LIFE CYCLE ENGINEERING INC

Company Information
Address
4360 CORPORATE RD
NORTH CHARLESTON, SC 29405-7439
United States


https://www.LCE.com

Information

UEI: S95EAVECVJA7

# of Employees: 435


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. Alternative System for Hangar Bay Access Doors

    Amount: $745,135.00

    Build and demonstrate a working proof of principle model for validation of the motor design process and verification of the proposed concept. The model will consist of a single sided motor stator, a ...

    SBIRPhase II2005Department of Defense Navy
  2. Alternative System for Hangar Bay Access Doors

    Amount: $69,795.00

    The Hangar Bay Deck Edge and Division doors, on aircraft carriers are in need of modification, in order to minimize maintenance and increase reliability. In both current applications, guide rails are ...

    SBIRPhase I2003Department of Defense Navy
  3. Alternative Drive System For Deck Edge Elevator

    Amount: $69,685.00

    The deck edge aircraft elevator (ACE), now in use on all active CVs and CVNs, is based on the system design principles established over 40 years ago. This system, while remaining one of the most reli ...

    SBIRPhase I2003Department of Defense Navy
  4. Design and Develop a Real-Time On-Line RMA Trends and Analysis Repoirting Assessment Database for Towed Array Systems

    Amount: $749,300.00

    "Submarine Towed Array Systems (TAS) requires a process forautomating the collection of system specific data related tofleet-wide operational performance. The purpose of implementingsuch a process is ...

    SBIRPhase II2002Department of Defense Navy
  5. N/A

    Amount: $69,133.00

    N/A

    SBIRPhase I2000Department of Defense Navy
US Flag An Official Website of the United States Government