You are here
MCGAW TECHNOLOGY INC
UEI: MWL2M6BK6XW1
# of Employees: 1
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Robust Cryogenic Compatible Turbo-machinery and Liquid Rocket Engine coatings
Amount: $1,499,997.00This hase II effort addresses the extension and refinement of the design system begun in the Phase I activity, further developed (toward turbines) in the current Phase II, for coatings and substrate ...
SBIRPhase II2017Department of Defense Air Force -
Noncontacting Full-Field Real-Time Strain Measurement System for Air Platforms in Combined Extreme Environments
Amount: $749,646.00Develop, demonstrate, and deliver a prototype accelerated information delivery noncontacting, 3-D, full-field strain system that can operate within the combined thermal static/dynamic loading conditio ...
SBIRPhase II2017Department of Defense Air Force -
Robust Cryogenic Compatible Turbo-machinery and Liquid Rocket Engine coatings
Amount: $740,874.00ABSTRACT: The goal of the Phase II is to extend an ICME-based approach to the design of thermal barrier coating architectures and processes to guide the design and selection of a newly defined mater ...
SBIRPhase II2015Department of Defense Air Force -
Noncontacting Full-Field Real-Time Strain Measurement System for Air Platforms in Combined Extreme Environments
Amount: $149,996.00ABSTRACT:The overall objective of this effort is to develop a non-contacting, full-field, strain measurement system that can provide real-time or quasi-real-time strain data for structures at temperat ...
SBIRPhase I2015Department of Defense Air Force -
Robust Cryogenic Compatible Turbo-machinery and Liquid Rocket Engine coatings
Amount: $149,997.00ABSTRACT: The goal of this Phase I is to demonstrate the feasibility of a ICME-based approach to the design of thermal barrier coating architectures and processes to guide the design and selection o ...
SBIRPhase I2013Department of Defense Air Force -
Advanced Characterization Techniques that Improve Durability of Fracture Critical DoD Components
Amount: $749,140.00Many DoD systems employ fracture critical and/or retirement for cause methodologies for asset deployment, operation and management. They are a key element in the design and certification of turbine en ...
SBIRPhase II2009Department of Defense Navy -
Advanced Characterization Techniques that Improve Durability of Fracture Critical DoD Components
Amount: $98,607.00Many DoD systems employ fracture critical and/or retirement for cause methodologies for asset deployment, operation and management. They are a key element in the design and certification of turbine en ...
SBIRPhase I2008Department of Defense Navy