You are here

MICHIGAN ENGINEERING SERVICES LLC

Company Information
Address
2890 CARPENTER RD STE 1900
ANN ARBOR, MI 48108-1198
United States



Information

UEI: VJRAZSJR4EF5

# of Employees: 8


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: Yes



Award Charts




Award Listing

  1. Risk and Uncertainty Management for Multidisciplinary System Design and Optimization

    Amount: $749,105.00

    The US General Accounting Office (USGAO) has identified that capturing design knowledge in terms of expected performance and cost comprises a critical exit requirement for transitioning from system in ...

    SBIRPhase II2008Department of Defense Navy
  2. Risk and Uncertainty Management for Multidisciplinary System Design and Optimization

    Amount: $99,871.00

    Computational methods and simulation based methodologies can be combined for optimizing the design of undersea weapons with respect to cost and performance. Multiple engineering disciplines such as: ...

    SBIRPhase I2007Department of Defense Navy
  3. Structural-Acoustic Simulations in Early Airframe Design

    Amount: $99,993.00

    The structural design during the early development of an aircraft focuses on strength, fatigue, corrosion, maintenance, inspection, and manufacturing. Usually the acoustic requirements are met after ...

    SBIRPhase I2007National Aeronautics and Space Administration
  4. Development of Blast Event Simulation

    Amount: $729,848.00

    The design of Army vehicles to resist blast from mines or from explosive devices is of great interest in order to provide protection to the vehicle and its occupants. Full size mine blast tests are e ...

    SBIRPhase II2006Department of Defense Army
  5. Advanced System of Systems Design Capability

    Amount: $99,656.00

    Successful advanced Naval ship design must be based on integrating multiple cross-functional systems. Future Naval systems will require innovation and a systematic integration in order to achieve inc ...

    STTRPhase I2006Department of Defense Navy
  6. Multidisciplinary Design Under Uncertainty for Entry Vehicles

    Amount: $599,461.00

    The physical difficulty of designing entry vehicles originates from the large degree of coupling between the various disciplines involved in the design. Every subsystem design decision has far reachi ...

    SBIRPhase II2006National Aeronautics and Space Administration
  7. Development of Blast Event Simulation

    Amount: $69,568.00

    The design of Army vehicles to resist blast from a mines or from explosive devices is of great interest in order to provide protection to the vehicle and its occupants. Full size mine blast tests are ...

    SBIRPhase I2005Department of Defense Army
  8. Probabilistic Error Estimation In Model-Based Predictions

    Amount: $748,626.00

    Modern ship designs can only be successful if the ship can survive in a hostile environment. External threats for a ship can originate from underwater detonations, anti-ship missiles, and even low te ...

    SBIRPhase II2005Department of Defense Navy
  9. Energy Finite Element Analysis System

    Amount: $749,588.00

    New Naval initiatives, like the DD(X) program, impose stringent noise and vibration targets, and require assessment and reduction of noise due to machinery, flow, and propulsion. A typical surface sh ...

    SBIRPhase II2005Department of Defense Navy
  10. Multidisciplinary Design Under Uncertainty for Entry Vehicles

    Amount: $69,878.00

    The physical difficulty of designing entry vehicles originates from the large degree of coupling between the various disciplines involved in the design. Every subsystem design decision has far reachi ...

    SBIRPhase I2005National Aeronautics and Space Administration
US Flag An Official Website of the United States Government