USA flag logo/image

An Official Website of the United States Government

A CARBON-CARBON REPAIR SYSTEM FOR THE FIRST WALL OF THE INTERNATIONAL…

Award Information

Agency:
Department of Energy
Branch:
N/A
Award ID:
17521
Program Year/Program:
1992 / SBIR
Agency Tracking Number:
17521
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
Nuclear & Aerospace Materials
16716 Martincoit Road Poway, CA 92064
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 1
Fiscal Year: 1992
Title: A CARBON-CARBON REPAIR SYSTEM FOR THE FIRST WALL OF THE INTERNATIONAL THERMONUCLEAR EXPERIMENTAL REACTOR
Agency: DOE
Contract: N/A
Award Amount: $50,000.00
 

Abstract:

HIGH THERMAL CONDUCTIVITY CARBON-CARBON COMPOSITES ARE CANDIDATES FOR THE FIRST WALL OF THE INTERNATIONAL THERMONUCLEAR EXPERIMENTAL REACTOR (ITER). HOWEVER, CARBON-CARBON COMPOSITES HAVE RELATIVELY HIGH EROSION RATES CAUSED BY HYDROGEN BOMBARDMENT WHEN THE PLASMA DISRUPTS. SUCH EROSION MAY REQUIRE FREQUENT REPLACEMENT OF THE FIRST WALL PANELS AND TILES, SERIOUSLY REDUCING THE DUTY FACTOR OF THE REACTOR. THIS PROGRAM ATTEMPTS TO DEVELOP A SYSTEM TO EFFECT IN SITU REPAIR OF THE DAMAGED CARBON-CARBON SURFACES (WITHOUT REMOVING THE ORIGINAL PANELS OR TILES). THIS SYSTEM DELIVERS A MIXTURE OF HYDROCARBON GAS AND FINE HIGH THERMAL CONDUCTIVITY VAPOR-GROWN FIBERS OR GRAPHITE POWDER TO A NOZZLE FOR MIXING, HEATING, AND DEPOSIT OF A FIBER-REINFORCED ISOTROPIC CARBON DIRECTLY ONTO THE DAMAGED SURFACES. THE STRUCTURE OF THE REPAIR CARBON COMPOSITE IS TAILORED BY CONTROLLING THE DEPOSITION CONDITIONS TO MATCH THE ORIGINAL CARBON-CARBON. IN PHASE I, A MODEL FOR THE CARBON DEPOSITION PROCESS IS BEING DEVELOPED. THE MODELLING WORK GUIDES THE CONCEPTUAL DESIGN OF THE SYSTEM. PRELIMINARY DESIGN IS BEING COMPLETED IN PHASE I. THE EQUIPMENT WILL BE CONSTRUCTED IN PHASE II AND OPERATED TO ESTABLISH WORKABILITY. AN EXPERIMENTAL PROGRAM BASED ON THE MODEL DEVELOPED IN PHASE I WILL BE IMPLEMENTED TO OPTIMIZE DEPOSITION CONDITIONS. THE STRUCTURE OF THE REPAIR CARBON WILL BE ANALYZED, AND DEPOSITIONS WILL BE ESTABLISHED TO MATCH THE ORIGINAL CARBON-CARBON. SPECIMENS OF THE REPAIR CARBON WILL BE FABRICATED FOR IRRADIATION AT OAK RIDGE NATIONAL LABORATORY.

Principal Investigator:


0

Business Contact:

Small Business Information at Submission:

Nuclear And Aerospace
16716 Martincoit Rd Poway, CA 92064

EIN/Tax ID:
DUNS: N/A
Number of Employees: N/A
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No