USA flag logo/image

An Official Website of the United States Government

Company Information:

Company Name:
Pacer Systems
Address:
900 Technology Park Dr
Billerica, MA 01821
Phone:
N/A
URL:
N/A
EIN:
N/A
DUNS:
N/A
Number of Employees:
30
Woman-Owned?:
No
Minority-Owned?:
No
HUBZone-Owned?:
No

Commercialization:

Has been acquired/merged with?:
N/A
Has had Spin-off?:
N/A
Has Had IPO?:
N/A
Year of IPO:
N/A
Has Patents?:
N/A
Number of Patents:
N/A
Total Sales to Date $:
$ 0.00
Total Investment to Date $
$ 0.00
POC Title:
N/A
POC Name:
N/A
POC Phone:
N/A
POC Email:
N/A
Narrative:
N/A

Award Totals:

Program/Phase Award Amount ($) Number of Awards
SBIR Phase I $361,880.00 8
SBIR Phase II $692,000.00 3

Award List:

ISAR PART TASK TRAINER

Award Year / Program / Phase:
1984 / SBIR / Phase I
Award Amount:
$50,000.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
Roger Smith
Abstract:
N/a

ISAR PART TASK TRAINER

Award Year / Program / Phase:
1985 / SBIR / Phase II
Award Amount:
$300,000.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
Roger Smith
Abstract:
The isar part task trainer is a training system which will maintain the proficiency of isar operators in the area of image analysis and classification. the system will be portable and support multi-platforms. the system will be comprised of a high resolution display, a video disk, microprocessors… More

INDEPENDENT VALIDATION AND VERIFICATION OF TACTICAL AIR OPERATIONS CENTRAL - '85 SOFTWARE

Award Year / Program / Phase:
1985 / SBIR / Phase I
Award Amount:
$37,326.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
Paul Palmer
Abstract:
N/a

PACER SYSTEMS, INC.

Award Year / Program / Phase:
1986 / SBIR / Phase I
Award Amount:
$41,321.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
David r daugherty
Abstract:
Pacer systems, inc. (pacer) proposes a phase i study to determine an approach for integrating embedded training with the future update iv avionics system and investigating the feasibility of retrofitting a selected portion of that embedded training into the existing-p-3c update iii. the study will… More

PACER SYSTEMS, INC (PACER) PROPOSES A PHASE I STUDY TO DETERMINE THE FEASIBILITY OF DEVELOPING A COST-EFFECTIVE, DEDICATED TRAINER THAT ADDRESSES VISUAL TARGET ACQUISITION PROBLEM BY PROVIDING AN ADEQUATE SIMULATION OF TARGET, MISSION PROFILE AND

Award Year / Program / Phase:
1986 / SBIR / Phase I
Award Amount:
$45,485.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
Ralph d fife
Abstract:
Pacer systems, inc (pacer) proposes a phase i study to determine the feasibility of developing a cost-effective, dedicated trainer that addresses visual target acquisition problem by providing an adequate simulation of target, mission profile and environmental factors. the study will take into… More

MODERN TRAINING MODEL CONCEPTS

Award Year / Program / Phase:
1986 / SBIR / Phase I
Award Amount:
$40,483.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Joan M Ryder
Abstract:
N/a

MODERN TRAINING MODEL CONCEPTS

Award Year / Program / Phase:
1987 / SBIR / Phase II
Award Amount:
$150,000.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Joan M Ryder
Abstract:
Current approaches to training development focus primarily on observable behaviors and largely ignore the mediational processes that are now thought to underlie learning. we propose to develop an integrated conceptual framework of skill acquisition using an information processing/cognitive science… More

CHEMICAL BIOLOGICAL AND RADIOLOGICAL DEFENSE TRAINING

Award Year / Program / Phase:
1987 / SBIR / Phase I
Award Amount:
$47,300.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
John a brink
Abstract:
The current equipment and techniques employed by united states military forces in response to actual or threatened chemical, biological, and radiological (cbr) warfare limit one's ability to perform essential functions. during prior research, tasks critical to continued operations in a cbr… More

INDEPENDENT VALIDATION AND VERIFICATION OF TACTICAL AIR OPERATIONS CENTRAL - '85 SOFTWARE

Award Year / Program / Phase:
1988 / SBIR / Phase II
Award Amount:
$242,000.00
Agency / Branch:
DOD / NAVY
Principal Investigator:
Paul Palmer
Abstract:
The tactical air operations central - 1985 (taoc-85) engineering development model (edm) software/firmware is baselined to 1979 - 1980 military documentation standards. independent validation and verification (iv&v) of this complex program package is required. the first phase of this small business… More

STUDENT PERFORMANCE MODEL

Award Year / Program / Phase:
1989 / SBIR / Phase I
Award Amount:
$49,965.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Dr Joan Ryder
Abstract:
This investigation examines the development process for student models to support intelligent tutoring systems, cognitive training, and cognitive research. specifically, the investigation will survey current methodologies in student model development to determine more efficient means to use… More

BRIDGING COGNITIVE TASK ANALYSIS TO ISD TRAINING DESIGN

Award Year / Program / Phase:
1990 / SBIR / Phase I
Award Amount:
$50,000.00
Agency / Branch:
DOD / USAF
Principal Investigator:
Peter F Beckschi
Abstract:
Cognitive science has provided a number of approaches and techniques which have been successfully employed in training programs. analysis of cognitive content of specific domains has proven to be valuable in the design and development of training programs. unfortunately, no systematic approach has… More