You are here

Plastronic, Inc.

Company Information
Address
35 Mary-Bill Dr.
Troy, OH 45373
United States



Information

UEI: N/A

# of Employees: 3


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. N/A

    Amount: $0.00

    N/A

    STTRPhase I1999Department of Defense Missile Defense Agency
  2. N/A

    Amount: $500,000.00

    N/A

    STTRPhase II1999Department of Defense Missile Defense Agency
  3. Low-Cost Long-Length Manufacturing of Continously Melt-Quenched Processed Fully Stabilized Multifilamentary High-Field Nb3AL Superconductor

    Amount: $100,000.00

    Not Available Increased awareness of health effects caused by airborne contaminants has incurred increased use of various kinds of air filters. However, filters for the specific application as identi ...

    SBIRPhase I1999Department of Energy
  4. Rapid Quench Nb3Al for High Field Accelerator Applications

    Amount: $750,000.00

    171 Rapid Quench Nb3Al for High Field Accelerator Applications--Plastronic, Inc., 35 Mary-Bill Drive, Troy, OH 45373-1033; (937) 335-0656 Mr. Michael Tomsic, Principal Investigator Mr. Michael Toms ...

    SBIRPhase II1998Department of Energy
  5. SBIR Phase I: Non-Vapor Deposition Method for Yttrium Barium Copper Oxide on a Textured Metal Su

    Amount: $100,000.00

    N/A

    SBIRPhase I1998National Science Foundation
  6. Rapid Quench Nb3Al for High Field Accelerator Applications

    Amount: $75,000.00

    171 Rapid Quench Nb3Al for High Field Accelerator Applications--Plastronic, Inc., 35 Mary-Bill Drive, Troy, OH 45373-1033; (937) 335-0656 Mr. Michael Tomsic, Principal Investigator Mr. Michael Toms ...

    SBIRPhase I1997Department of Energy
  7. High-Strength, Low AC-loss High Temperature Superconductor

    Amount: $59,892.00

    For motor, generator, transformer, and transmission line applications, demonstration projects have been conducted using Bi:2223 high temperature superconductors. There is the desire to use these cond ...

    SBIRPhase I1997Department of Defense Missile Defense Agency
  8. NEW METHOD FOR IMPROVING THE PRODUCTIVITY OF GAS METAL ARC WELDING AND FLUX CORED ARC WELDING

    Amount: $40,000.00

    CURRENTLY GAS METAL ARC WELDING AND FLUX CORED ARC WELDING HAS THE LIMITATION THAT FOR A GIVEN WIRE DIAMETER, THE PROCESS HAS A GIVEN MINIMUM AND MAXIMUM WIRE FEED SPEED RANGE TO OBTAIN A CONSISTENT S ...

    SBIRPhase I1987National Science Foundation
  9. THERE IS A NATIONAL NEED FOR A LOW CAPITAL EQUIPMENT AND LOW OPERATING COST SURFACE HARDENING PROCESS AS COMPARED TO LASER, ELECTRON BEAM, AND INDUCTION HARDENING.

    Amount: $35,000.00

    THERE IS A NATIONAL NEED FOR A LOW CAPITAL EQUIPMENT AND LOW OPERATING COST SURFACE HARDENING PROCESS AS COMPARED TO LASER, ELECTRON BEAM, AND INDUCTION HARDENING. BY LOWERING THE COST OF SURFACE HARD ...

    SBIRPhase I1984National Science Foundation
US Flag An Official Website of the United States Government