You are here

RJ LEE GROUP INC

Company Information
Address
350 HOCHBERG RD
MONROEVILLE, PA 15146-1516
United States


http://www.rjlg.com

Information

UEI: H1DFZK529K81

# of Employees: 175


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. SBIR Phase II: Development of a Scanning Electron Microscope (SEM) Simulator for Use in Education

    Amount: $499,820.00

    This SBIR Phase II project will result in a low cost PC based interactive scanning electron microscope (iSEM) simulator incorporated into modules to enhance existing science curricula. Although the S ...

    SBIRPhase II2003National Science Foundation
  2. SBIR Phase II: Development of a Scanning Electron Microscope (SEM) Simulator for Use in Education

    Amount: $0.00

    This SBIR Phase II project will result in a low cost PC based interactive scanning electron microscope (iSEM) simulator incorporated into modules to enhance existing science curricula. Although the S ...

    SBIRPhase I2003National Science Foundation
  3. Predictive Durability Model for Life Extension of Naval Waterfront Concrete

    Amount: $0.00

    The two-year SBIR Phase 2 effort will be focused on the extension of an existing numerical model, called STADIUM(SM), to the treatment of additional concrete durability problems. STADIUM(SM) is a fini ...

    SBIRPhase I2003Department of Defense Navy
  4. Predictive Durability Model for Life Extension of Naval Waterfront Concrete

    Amount: $509,976.00

    The two-year SBIR Phase 2 effort will be focused on the extension of an existing numerical model, called STADIUM(SM), to the treatment of additional concrete durability problems. STADIUM(SM) is a fini ...

    SBIRPhase II2003Department of Defense Navy
  5. Development of an SEM Simulator for Use in Education

    Amount: $99,766.00

    This Small Business Innovative Research (SBIR) Phase I project will determine the feasibility of designing the scanning electron microscope (SEM) component of an instrument simulator. Cost prohibits ...

    SBIRPhase I2002National Science Foundation
  6. Predictive Durability Model for Life Extension of Naval Waterfront Concrete

    Amount: $69,758.00

    "Concrete durability and its impact on life-cycle infrastructure costs and military readiness is a major societal issue. This SBIR Phase I project focuses on the development and demonstration of the ...

    SBIRPhase I2002Department of Defense Navy
  7. Materials Knowledge Base

    Amount: $99,998.00

    The overall technical objective is to develop the information systems technology necessary to implement a Materials Knowledge Base. This object-based data repository will allow the acquisition and st ...

    SBIRPhase I2001Department of Defense Air Force
  8. N/A

    Amount: $0.00

    N/A

    STTRPhase I2000Department of Energy
  9. N/A

    Amount: $500,000.00

    N/A

    STTRPhase II2000Department of Energy
  10. SEM/MIRS Characterization of Nitrogenated Particulate Matter

    Amount: $99,959.00

    N/A

    STTRPhase I1999Department of Energy
US Flag An Official Website of the United States Government