You are here
RJ LEE GROUP INC
UEI: H1DFZK529K81
# of Employees: 175
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
SBIR Phase II: Development of a Scanning Electron Microscope (SEM) Simulator for Use in Education
Amount: $499,820.00This SBIR Phase II project will result in a low cost PC based interactive scanning electron microscope (iSEM) simulator incorporated into modules to enhance existing science curricula. Although the S ...
SBIRPhase II2003National Science Foundation -
SBIR Phase II: Development of a Scanning Electron Microscope (SEM) Simulator for Use in Education
Amount: $0.00This SBIR Phase II project will result in a low cost PC based interactive scanning electron microscope (iSEM) simulator incorporated into modules to enhance existing science curricula. Although the S ...
SBIRPhase I2003National Science Foundation -
Predictive Durability Model for Life Extension of Naval Waterfront Concrete
Amount: $0.00The two-year SBIR Phase 2 effort will be focused on the extension of an existing numerical model, called STADIUM(SM), to the treatment of additional concrete durability problems. STADIUM(SM) is a fini ...
SBIRPhase I2003Department of Defense Navy -
Predictive Durability Model for Life Extension of Naval Waterfront Concrete
Amount: $509,976.00The two-year SBIR Phase 2 effort will be focused on the extension of an existing numerical model, called STADIUM(SM), to the treatment of additional concrete durability problems. STADIUM(SM) is a fini ...
SBIRPhase II2003Department of Defense Navy -
Development of an SEM Simulator for Use in Education
Amount: $99,766.00This Small Business Innovative Research (SBIR) Phase I project will determine the feasibility of designing the scanning electron microscope (SEM) component of an instrument simulator. Cost prohibits ...
SBIRPhase I2002National Science Foundation -
Predictive Durability Model for Life Extension of Naval Waterfront Concrete
Amount: $69,758.00"Concrete durability and its impact on life-cycle infrastructure costs and military readiness is a major societal issue. This SBIR Phase I project focuses on the development and demonstration of the ...
SBIRPhase I2002Department of Defense Navy -
Materials Knowledge Base
Amount: $99,998.00The overall technical objective is to develop the information systems technology necessary to implement a Materials Knowledge Base. This object-based data repository will allow the acquisition and st ...
SBIRPhase I2001Department of Defense Air Force -
N/A
Amount: $0.00N/A
STTRPhase I2000Department of Energy -
N/A
Amount: $500,000.00N/A
STTRPhase II2000Department of Energy -
SEM/MIRS Characterization of Nitrogenated Particulate Matter
Amount: $99,959.00N/A
STTRPhase I1999Department of Energy