USA flag logo/image

An Official Website of the United States Government

Company Information:

Company Name:
Underground Systems, Inc.
Address:
84 Business Park Drive
Suite 109
Armonk, NY 10504-
Phone:
(914) 273-8727
URL:
N/A
EIN:
132837950
DUNS:
709587640
Number of Employees:
50
Woman-Owned?:
No
Minority-Owned?:
No
HUBZone-Owned?:
No

Commercialization:

Has been acquired/merged with?:
N/A
Has had Spin-off?:
N/A
Has Had IPO?:
N/A
Year of IPO:
N/A
Has Patents?:
N/A
Number of Patents:
N/A
Total Sales to Date $:
$ 0.00
Total Investment to Date $
$ 0.00
POC Title:
N/A
POC Name:
N/A
POC Phone:
N/A
POC Email:
N/A
Narrative:
N/A

Award Totals:

Program/Phase Award Amount ($) Number of Awards
SBIR Phase I $297,179.00 3
SBIR Phase II $2,727,331.00 3

Award List:

Low Cost Sensors for Real Time Monitoring of Overhead Transmission Lines

Award Year / Program / Phase:
2005 / SBIR / Phase I
Award Amount:
$98,916.00
Agency:
DOE
Principal Investigator:
Abstract:
79057S A dynamic line rating (DLR) system operates in real time and extracts maximum performance data from overhead transmission and distribution lines. Historically, the costs of such systems have been too high to justify widespread adaption into transmission control systems. This project will… More

Low Cost Sensors for Real Time Monitoring of Overhead Transmission Lines

Award Year / Program / Phase:
2006 / SBIR / Phase II
Award Amount:
$745,600.00
Agency:
DOE
Principal Investigator:
Abstract:
Historically, the cost of systems that operate in real time and extract performance data from overhead transmission and distribution lines has been too high to justify widespread adaption into transmission control systems. This project will develop a low cost, wireless sensor for the real time… More

Adaptive Predictive Algorithms for Renewables Integration

Award Year / Program / Phase:
2009 / SBIR / Phase I
Award Amount:
$98,704.00
Agency:
DOE
Principal Investigator:
Abstract:
A robust software algorithm is needed to monitors the conditions of the electricity grid in real time and use historical statistical data to predict behavior under various future conditions. The algorithm could be used release additional capacity, and improve the reliability and economic efficiency… More

Adaptive Predictive Algorithms for Renewables Integration

Award Year / Program / Phase:
2010 / SBIR / Phase II
Award Amount:
$997,440.00
Agency:
DOE
Principal Investigator:
Abstract:
The

Underground Cable Advanced Diagnostics

Award Year / Program / Phase:
2010 / SBIR / Phase I
Award Amount:
$99,559.00
Agency:
DOE
Principal Investigator:
Abstract:
In order to optimize the operating efficiency of the underground transmission system utilities must be able to safely maximize the power cable system

Underground Cable Advanced Diagnostics

Award Year / Program / Phase:
2011 / SBIR / Phase II
Award Amount:
$984,291.00
Agency:
DOE
Principal Investigator:
Abstract:
In order to optimize the operating efficiency of the underground transmission system utilities must be able to safely maximize the power cable systems capacity. This allows the operator to: (1) Establish efficient generation scheduling; (2) Maximize power transfer capability; and (3) Extend… More