You are here

Phase Controlled PM Generator for the AAAV

Award Information
Agency: Department of Defense
Branch: Navy
Contract: N/A
Agency Tracking Number: 40467
Amount: $67,147.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1998
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
425 Corporate Circle
Golden, CO 80401
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Jon F. Lutz
 (303) 278-2002
Business Contact
Phone: () -
Research Institution
N/A
Abstract

The Marine Corps¿ next generation amphibious assault vehicle requires improved power generation capabilities due to increased power demand. Versatility (e.g., capability to drive two generators in parallel), high efficiency, and temperature independent voltage regulation are the goals of this development. Unique Mobility, Incorporated is ideally positioned to achieve these goals due to 15 years experience in applying small, lightweight, and efficient brushless permanent magnet (PM) motors and generators within vehicle applications. Unique is currently involved in many hybrid electric vehicle motors and generator programs, collaborating with Orbital Engine Corporation, Northrop Grumman, Houston Metro Transit Authority, US Department of Transportation, Deere & Company, and DARPA, as well as others. Within generator applications specifically, Unique¿s method of delivering constant voltage over a wide range of generator speeds and temperatures results in a minimum power electronics and delivers high efficiencies, usually exceeding 90% across a wide band. This experience is vital to improving the AAAV power generation system, where the Phase I goal will be to design an optimized generator with associated electronics. System efficiency in excess of 85% across the operating region is anticipated. A set of conceptual drawings along with prototype and production cost estimates will be included in the Phase I report.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government