Fiscal Year:
2011
Title:
TAS::75 0894::TAS SBIR FAST-TRACK (TOPIC 37) - PHASE II OPTION EXERCISED
Agency:
HHS
Contract:
N43HD100010
Award Amount:
$379,677.00
Abstract:
Under Phase I of this SBIR Fast-track project, a base manufacturing process to produce a reliable, robust ethanol biosensor will be developed and the feasibility of the biosensor, capable of real-time monitoring of ethanol, will be demonstrated and a functional prototype ethanol biosensor will be delivered. During Phase II, the biosensor design prototype and multi-sensor array (a three-channel wireless potentiostat for rats) will be finalized and the manufacturing process will be optimized. The biosensorwill be validated in vitro and in vivo and introduced to the commercial market.
Small Business Information at Submission:
PINNACLE TECHNOLOGY INC
2721 OREGON ST LAWRENCE, KS 66046-4947
EIN/Tax ID:
742818617
DUNS:
N/A
Number of Employees:
N/A
Woman-Owned:
Yes
Minority-Owned:
No
HUBZone-Owned:
No