You are here
Pratt & Miller Engineering & Fabrication, LLC
UEI: Y1ZSV1VTQH88
# of Employees: 200
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Compact Injury Mitigating Recoverable Isolated Floor (CIMRIF) Integration
Amount: $680,161.30Pratt & Miller will provide an injury mitigating, isolated floor system structure capable of resetting during an underbelly blast event between initial impulse and return-to-ground impact.
SBIRPhase II2020Department of Defense Army -
Lightweight Gearbox for Air Cushion Vehicles
Amount: $490,851.00The Re-Designed Lightweight Gearbox
SBIRPhase II2019Department of Defense Navy -
Preview Sensing Suspension
Amount: $755,923.06PME proposes to extend the successes of the Phase I work with a Phase II prototyping effort which will demonstrate the feasibility of the approach on an actual vehicle with the controls running in rea ...
SBIRPhase II2019Department of Defense Army -
Advanced Human Type Target
Amount: $97,230.59PME proposes the RIHT Target (pronounced Right), the Resettable, Interactive, Human-Type Target. The RIHT Target follows a product line approach leveraging a series of systems that combine to provide ...
SBIRPhase I2018Department of Defense Army -
Preview Sensing Suspension
Amount: $149,071.08The PASS system is an innovative mobility subsystem that combines a terrain preview sensor suite, a processor and simultaneous localization and mapping (SLAM) algorithm, and semi-active or active susp ...
SBIRPhase I2018Department of Defense Army -
Lightweight Gearbox for Air Cushion Vehicles
Amount: $124,868.00Insert Abstract here
SBIRPhase I2018Department of Defense Navy -
CIMRIF: Compact, Injury Mitigating, Recoverable, Isolated Floor
Amount: $990,861.30Tibia and lower leg injuries are a major concern in underbody blast events which have been identified as one of the most common causes of war time lower limb injuries. Approximately one third of all s ...
SBIRPhase II2017Department of Defense Army -
Back Extraction Blast Seat
Amount: $99,973.47Ground vehicle interiors are decreasing in size making evacuation of an injured Soldier following an event without inducing further injury increasingly difficult. The government is interested in a new ...
SBIRPhase I2016Department of Defense Army -
Autonomous Trackless Vehicle Target
Amount: $990,389.00The ultimate goal of this Subsequent Phase II effort is to add additional capability and reliability to the AVeTar prototype. This effort will include design and development of the moving autonomous v ...
SBIRPhase II2016Department of Defense Army -
CIMRIF: Compact, Injury Mitigating, Recoverable, Isolated Floor
Amount: $98,530.00Tibia and lower leg injuries are a major concern in underbody blast events which have been identified as one of the most common causes of war time lower limb injuries. Approximately one third of all s ...
SBIRPhase I2015Department of Defense Army