You are here

Accelogic, LLC

Company Information
Address
1633 BONAVENTURE BLVD
WESTON, FL 33326-4040
United States


http://www.accelogic.com

Information

UEI: LJGLU5UUYEC8

# of Employees: 36


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. An FPGA Linear Algebra Library for Maximal-Performance Petascale Supercomputing

    Amount: $749,999.00

    Over 70% of supercomputing usage today is dedicated to solving large systems of linear equations. Linear equations are at the core of the most important DOE computational problems in energy fusion res ...

    SBIRPhase II2008Department of Energy
  2. Novel Supercomputing Approaches for High Performance Linear Algebra Using FPGAs

    Amount: $100,000.00

    We propose to develop novel FPGA-based algorithmic technology that will enable unprecedented computational power for the solution of large sparse linear equation systems. In Phase I, we will develop a ...

    SBIRPhase I2007National Aeronautics and Space Administration
  3. An FPGA Linear Algebra Library for Maximal-Performance Petascale Supercomputing

    Amount: $100,000.00

    It is estimated that over 70% of supercomputing usage today is dedicated to solving large systems of linear equations, such as those at the core of DOE computational problems in fusion research, accel ...

    SBIRPhase I2007Department of Energy
  4. Algorithm Development for Reconfigurable Computing Architectures

    Amount: $100,000.00

    Partial Differential Equations (PDEs) are at the core of Air Force scientific priorities in air vehicle design. The goal of this STTR is to provide unprecedent computational power to the solution o ...

    STTRPhase I2007Department of Defense Air Force
  5. Novel Computational Approaches for Solving Optimization Problems

    Amount: $99,900.00

    We propose to develop novel hardware-centric "initialization" technology that enables unprecedented computational power for the solution of general optimization problems. In Phase I, we will develop a ...

    SBIRPhase I2005Department of Defense Air Force
US Flag An Official Website of the United States Government