USA flag logo/image

An Official Website of the United States Government

IN-SITU RESPONSE TIME TESTING OF NUCLEAR PLANT PRESSURE SENSORS

Award Information

Agency:
Department of Energy
Branch:
N/A
Award ID:
7811
Program Year/Program:
1988 / SBIR
Agency Tracking Number:
7811
Solicitation Year:
N/A
Solicitation Topic Code:
N/A
Solicitation Number:
N/A
Small Business Information
Analysis And Measurement Services Corporation
9119 Cross Park Drive Knoxville, TN 37923-4505
View profile »
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No
 
Phase 1
Fiscal Year: 1988
Title: IN-SITU RESPONSE TIME TESTING OF NUCLEAR PLANT PRESSURE SENSORS
Agency: DOE
Contract: N/A
Award Amount: $50,000.00
 

Abstract:

THE DEVELOPMENT OF NOISE ANALYSIS FOR IN-SITU RESPONSE TIME TESTING OF SAFETY SYSTEM PRESSURE SENSORS IN NUCLEAR POWERPLANTS IS UNDER WAY. THE TECHNIQUE IS BASED ON RECORDING THE NATURALLY OCCURRING FLUCTUATIONS THAT EXIST AT THE OUTPUT OF PRESSURE SENSORS AS THE PLANT IS OPERATING. THESE FLUCTUATIONS CAN BE ANALYZED TO GIVE THE SENSOR TRANSFER FUNCTION FROM WHICH THE SENSOR RESPONSE CAN BE DETERMINED. WITHOUT ADDITIONAL EFFORT, NOISE ANALYSIS PROVIDES INFORMATION ABOUT THE STATUS OF SENSING PRESSURE LINES THAT EXTEND FROM THE PROCESS TO THE SENSOR. ANY SENSING LINE BLOCKAGE WILL MANIFEST ITSELF IN THE RESULTS OF NOISE ANALYSIS FOR PRESSURE SENSOR RESPONSE TIME TESTING. PRESENTLY, PRESSURE SENSORS ARE TESTED USING A PRESSURE SIGNAL GENERATOR TO APPLY A PRESSURE WAVEFORM TO THE SENSOR AND MEASURE ITS DELAY. EXPERIENCE HAS SHOWN THAT THIS METHOD PRODUCES ERRONEOUS RESULTS BECAUSE OF INHERENT DIFFICULTIES WITH THE TEST. IN ADDITION, THE CURRENT METHOD REQUIRES ACCESS TO EACH SENSOR, WHICH USUALLYRESULTS IN RADIATION EXPOSURE TO TEST PERSONNEL. ANOTHER DISADVANTAGE OF THE PRESENT METHOD IS THAT IT DOES NOT ACCOUNT FOR THE EFFECT OF VOIDS OR BLOCKAGES THAT MAY EXIST IN THE SENSING LINES. THIS PROJECT TAKES ADVANTAGE OF RECENT ADVANCES IN SIGNAL PROCESSING TECHNIQUES AND INTERPRETATION METHODS. THE PHASE I EFFORT IS CONCENTRATINGON RESEARCH ON VALIDATION OF NOISE ANALYSIS FOR RESPONSE TIME TESTING OF PRESSURE, LEVEL, AND FLOW SENSORS IN NUCLEAR POWERPLANTS.

Principal Investigator:

Hm hashemian
0

Business Contact:

Km Petersen
6156911756
Small Business Information at Submission:

Analysis & Measurement Service
9111 Cross Park Drive Nw Knoxville, TN 37923

EIN/Tax ID:
DUNS: N/A
Number of Employees: N/A
Woman-Owned: No
Minority-Owned: No
HUBZone-Owned: No