Award

Portfolio Data

Icon: back arrowBack to Award Search

Topology Optimized High-Rate, Reduced Life Cycle Cost Airframe using CF3D®

Awardee

Continuous Composites Inc.

216 E Coeur D Alene Ave
Coeur D Alene, ID, 83814-2832
USA

Award Year: 2023

UEI: WS2YAMKAAWH9

HUBZone Owned: No

Woman Owned: No

Socially and Economically Disadvantaged: No

Congressional District: 1

Tagged as:

SBIR

Phase I

Seal of the Agency: DOD

Awarding Agency

DOW

Branch: NAVY

Total Award Amount: $144,459

Contract Number: N68335-23-C-0377

Agency Tracking Number: N231-069-0815

Solicitation Topic Code: N231-069

Solicitation Number: 23.1

Abstract

Continuous Fiber 3D (CF3D) manufacturing is a cutting-edge composite manufacturing technology that has the potential to enable higher-performing (e.g., specific stiffness, specific strength) and lower-cost (e.g., less material waste, minimized part count, reduced touch labor) structures for future Navy applications. CF3D works by combining dry fiber tows with liquid snap-curing thermoset resin inside of a print head on the end of a six-axis robotic arm. As the green composite is discharged and consolidated, it is snap-cured into place enabling the manufacturing of complex composite structures (e.g., fiber steering, stacking, tight contours) with high fiber volume fractions (>50%) and low void volume fractions (<2%). Advanced manufacturing techniques such as CF3D will benefit the Navy greatly as it continues innovative high rate, low life cycle airframes. The proposed innovation is to enable topology optimized, fiber-steered, stiffened structures to be made using the emerging CF3D® manufacturing process that is suitable for Navy UAV use. This proposal endeavors to advance and characterize the CF3D® materials and process through testing  and preliminary model validation. Testing will be conducted at the coupon and representative structure sub-scale. The equipment manufactured and processes developed by Continuous Composite will enable many innovators and manufacturers to develop hardware for the Navy and customers with unique composite needs. Phase I Base will include coupon, intersection, and stiffened panel testing along with the development and delivery of a topology optimized stiffened panel. Phase I Option with include further development, testing, FEA and test planning for Phase II.

Award Schedule

  1. 2023
    Solicitation Year

  2. 2023
    Award Year

  3. July 17, 2023
    Award Start Date

  4. January 16, 2024
    Award End Date

Principal Investigator

Name: Nathan Stranberg
Phone: (509) 879-8690
Email: nstranberg@continuouscomposites.com

Business Contact

Name: Sophia Avery
Phone: (509) 863-1015
Email: savery@continuouscomposites.com

Research Institution

Name: N/A