You are here

A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

Award Information
Agency: Department of Energy
Branch: N/A
Contract: N/A
Agency Tracking Number: 27305
Amount: $74,377.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1994
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
Po Box 2687
Santa Fe, NM 87504
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 Dr Willard L Talbert
 (505) 982-6742
Business Contact
Phone: () -
Research Institution
N/A
Abstract

PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOISOTOPES). THERE IS A NEED, ESPECIALLY FOR THE PRODUCTION OF SHORT-LIVED RADIOSOTOPES, TO DEVELOP NUCLEAR TARGETS THAT OPTIMIZE PRODUCTION OF ISOTOPES IN THE VAPOR STATE. THIS ALLOWS ON LINE COLLECTION AND PROCESSNG, THUS GREATLY IMPROVING THE NET PRODUCTION EFFICIENCY FOR A GIVEN HIGH ENERGY PARTICLE BEAM. THIS IMPROVEMENT WILL BE ACHIEVED BY THE ABILITY TO SET THE TARGET OPERATING TEMPERATURE TO OPTIMIZE THE DIFFUSION AND DESORPTION OF THE RADIOISOTOPE SPECIES OF INTEREST. TO THIS EFFECT, THE FEASIBILITY OF A NEW TARGET DESIGN, UTILIZING THERMAL IMPEDANCE MATERIALS SUCH AS POROUS METALS AND WOVEN WIRE MESHES INTERPOSED BETWEEN THE TARGET CHAMBER PROPER AND THE COOLING JACKET WILL BE STUDIED. SUCH AN APPROACH HAS ATTRACTIVE FEATURES FOR CONTROLLING THE TRANSPORT OF HEAT, AND HAS BEEN PROPOSED IN INITIAL CONCEPTS FOR A RADIOACTIVE BEAM FACILITY AT TRIUMF (VANCOUVER, B.C., CANADA). SUCCESSFUL COMPLETION OF PHASE I WILL LEAD TO THE PRODUCTION OF A TARGET PROTOTYPE TO BE TESTED AT AN EXISTING ACCELERATOR FACILITY.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government