SBIR Phase I: A Novel Joining Process for Tubular Structures in Automotive and Aerospace Applications

Award Information
Agency:
National Science Foundation
Branch
n/a
Amount:
$100,000.00
Award Year:
2001
Program:
SBIR
Phase:
Phase I
Contract:
0060534
Agency Tracking Number:
0060534
Solicitation Year:
n/a
Solicitation Topic Code:
n/a
Solicitation Number:
n/a
Small Business Information
Engineering Mechanics Corporation of Columbus
3518 Riverside Dr.,Suite 202, Columbus, OH, 43221
Hubzone Owned:
N
Socially and Economically Disadvantaged:
N
Woman Owned:
N
Duns:
n/a
Principal Investigator:
Zhili Feng
(614) 459-3200
zfeng@columbus.rr.com
Business Contact:
Yong-Yi Wang
Vice President
(614) 459-3200
wangemc2@columbus.rr.com
Research Institution:
n/a
Abstract
This Small Business Innovation Research (SBIR) Phase I project explores the feasibility of using a newly invented novel materials joining process based on electromagnetic theory as a reliable and economic method to weld tubular structures. The project will conduct research and engineering that will address the following critical technical hurdles for the commercial implementation and dissemination of the new welding technology: (1) A comprehensive understanding and characterization of the process; (2) An effective methodology for design and optimization of the system apparatus and welding procedure; (3) Special weld head design and manufacturing to allow for quick loading and unloading the workpiece in the production environment; (4) Industrial system prototyping for an automated welding system that can be integrated in automotive assembly line, and (5) Process and performance specifications. The successful development of such technology would revolutionize the assembly process of the hydroformed tubular structures in automotive chassis and space frame applications. It will also promote the hybrid automotive body structure design that uses both aluminums and steels, and enable joining of different materials such as titanium to superalloys for aerospace and electronic applications. A new multi-million dollar/year specialty tube joining process is expected in about 5 years.

* information listed above is at the time of submission.

Agency Micro-sites

US Flag An Official Website of the United States Government