You are here
ANALYSIS AND MEASUREMENT SERVICES CORPORATION
UEI: HWG4CG5VK931
# of Employees: 67
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Development of Cable Insulation Materials for Small Modular Reactors
Amount: $199,351.00Small modular reactors will provide safe reliable clean electricity as well as enable hydrogen production, industrial heat generation, and water desalination. However, to realize the full benefits of ...
SBIRPhase I2022Department of Energy -
Advanced Process Instrumentation System for Next-Generation Nuclear Reactors
Amount: $199,472.00The next generation of reactors will provide safe, reliable, and clean electricity as well as enable new applications for nuclear energy including hydrogen production, industrial heat generation, and ...
STTRPhase I2022Department of Energy -
Methods to Evaluate Embedded Sensor Performance and Reliability in TCR Components
Amount: $199,705.00The next generation of nuclear reactors are under development to leverage innovative technologies to deliver safe, low-cost, and clean electricity and support new applications for nuclear energy. Amon ...
SBIRPhase I2021Department of Energy -
Online Monitoring System to Support Autonomous Remote Microreactor Operations
Amount: $1,149,411.00Microreactors are factoryfabricated and transportable reactors that can be used for electricity production and thermal energy generation in remote offgrid locations. They are designed to be selfregula ...
SBIRPhase II2021Department of Energy -
Online Cable Condition Monitoring and Aging Management of Nuclear Power Plant Cables and End Devices.
Amount: $199,858.98Currently many nondestructive evaluation techniques exist for cable condition monitoring, but most of these cable analysis methods are applied to de-energized cables and require disconnecting the cabl ...
SBIRPhase I2020Department of Energy -
Online Monitoring System to Support Autonomous Remote Microreactor Operations
Amount: $199,935.84Microreactors are factory-fabricated and transportable reactors that can be used for electricity production and thermal energy generation in remote off-grid locations. They are designed to be self- re ...
SBIRPhase I2020Department of Energy -
VERA Software Validation using In-Plant Data
Amount: $199,705.28As nuclear plant owners extend their operating licenses from 40 to 60 or 80 years, there is uncertainty about the long-term health of major plant components subject to high doses of radiation includin ...
SBIRPhase I2020Department of Energy -
Health Monitoring of Digital I&C Systems Using Online Electromagnetic Measurements
Amount: $999,851.00Instrumentation and control systems in nuclear power plants are made of an assembly of analog and/or digital components which together emit a unique electromagnetic signature that relates to the condi ...
SBIRPhase II2019Department of Energy -
Fault Detection of Digital Instrumentation and Control Systems using Integrated Electromagnetic Compatibility and Automated Functional Testing
Amount: $999,775.00Electromagnetic compatibility testing guidelines developed by the Nuclear Regulatory Commission and the Electric Power Research Institute are currently used in the nuclear industry to ensure that digi ...
SBIRPhase II2019Department of Energy -
Instrumentation and Control Design for Small Modular Reactors
Amount: $999,794.00Small Modular Reactors are one of the most compelling options for meeting the growing clean energy demands of the U.S. While safer and costing less to build and operate than their conventional counter ...
SBIRPhase II2018Department of Energy