You are here

Computerized Robotic Delayering and Polishing System

Award Information
Agency: Department of Defense
Branch: Defense Microelectronics Activity
Contract: HQ072719P0021
Agency Tracking Number: 19-9B7
Amount: $149,249.77
Phase: Phase I
Program: STTR
Solicitation Topic Code: DMEA18B-001
Solicitation Number: 18.B
Timeline
Solicitation Year: 2018
Award Year: 2019
Award Start Date (Proposal Award Date): 2019-03-02
Award End Date (Contract End Date): 2019-09-15
Small Business Information
4065 Executive Dr.
Beavercreek, OH 45430
United States
DUNS: 782766831
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: Yes
Principal Investigator
 Sivaram P Gogineni
 Sr. Research Engineer
 (937) 266-9570
 sivaram.gogineni@spectralenergies.com
Business Contact
 Dr. Sivaram P. Gogineni
Phone: (937) 266-9570
Email: sivaram.gogineni@spectralenergies.com
Research Institution
 University of Dayton
 Prof. Vamsy Chodavarapu Prof. Vamsy Chodavarapu
 
300 College Park
Dayton, OH 45469
United States

 (937) 229-3611
 Nonprofit College or University
Abstract

The proposed research and technical objectives in this project deal with computerized automatic delayering and polishing system that would be applicable to both commercial and government semiconductor device research and development with applications including Failure Analysis (FA), Fault Isolation (FI), and Reverse Engineering (RE) of semiconductor microelectronic devices. This project could help overcome the Diminishing Manufacturing Sources and Material Shortages (DMSMS) using an automatic reverse engineering of obsolete integrated circuits. During Phase I, the research team will optimize their existing sample-preparation tool to perform front-side delayering, backside thinning, and cross-sectioning with sub-micrometer scale precision. The team will study removal rates using the system for various semiconductor materials so that an automatic process can be developed for precision sample preparation. In Phase II, the team will produce a fully functioning prototype that adheres to all the constraints mentioned in Phase I. We will test the prototype system and deliver it along with at least 2 samples for each application, for a total of at least 6 samples. Finally, we will deliver a complete Bill of Materials, including all components used, manufacturers, part numbers, quantities, technical datasheets, facility requirements, CAD drawings and a complete CAD assembly for the completed prototype.