You are here

Prediction of the Full-Scale Cook-off Response Based on Small-Scale Testing

Award Information
Agency: Department of Defense
Branch: Navy
Contract: N68335-10-C-0451
Agency Tracking Number: N10A-011-0627
Amount: $99,995.00
Phase: Phase I
Program: STTR
Solicitation Topic Code: N10A-T011
Solicitation Number: 2010.A
Timeline
Solicitation Year: 2010
Award Year: 2010
Award Start Date (Proposal Award Date): 2010-07-30
Award End Date (Contract End Date): 2011-07-15
Small Business Information
29B Montvale Ave.
Woburn, MA 01801
United States
DUNS: 617362579
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 N. Moussa
 President
 (781) 759-0700
 amoussa@blazetech.com
Business Contact
 Venkat Devarakonda
Title: Vice President
Phone: (781) 759-0700
Email: venkat@blazetech.com
Research Institution
 Sandia National Labs (Alb, NM)
 Gilbert Herrera
 
P.O. Box 5800 - MS 1079
Albuquerque, NM 87185
United States

 (505) 284-6701
 Federally Funded R&D Center (FFRDC)
Abstract

We propose to develop scaling relationships for reaction violence in the cook-off of energetic materials such as explosives or propellants. This will be accomplished by a coordinated effort consisting of data review and analysis. The anticipated results include key non-dimensional parameters that incorporate the thermo-physical, flow, thermodynamic, and kinetic properties of the material, the heating rate in terms of intensity and duration, the thermo-physical properties of the casing and liner (if any), and the strength and degree of confinement of the casing. Furthermore, scaling relationships will be developed for the violence of the reaction relating attributes such overpressure, vivacity, casing fragmentation, and travel distance of fragments to non-dimensional parameters. This scaling relationship will be used to identify practical means of compensating for the reduction of scale in the experiments. Key comparisons and success criteria will be identified to evaluate our scaling approach. The project will also identify data gaps and key tests and instrumentation to be performed in Phase II.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government