You are here

O'donnell Consulting Engineers

Company Information
Address
3611 Maplevue Dr
Bethel Park, PA 15102
United States



Information

UEI: VH1PXHNANJM3

# of Employees: N/A


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: Yes



Award Charts




Award Listing

  1. Investigation of an Advanced Hand-Cycle Drive System for People with Disabilities

    Amount: $149,631.00

    DESCRIPTION (provided by applicant): Human powered vehicles provide fundamental and often the sole means of transportation for millions of people throughout the world. For people with particular type ...

    SBIRPhase I2010Department of Health and Human Services National Institutes of Health
  2. DESIGN AND MANUFACTURING FOR CORROSION FATIGUE LIFE

    Amount: $50,000.00

    WHILE CORROSION FATIGUE LIMITS THE USEFUL LIFE OF A LARGE NUMBER OF MECHANICAL COMPONENTS, THERE CURRENTLY ARE NO QUANTIFIED METHODS OF EVALUATING THIS FAILURE MODE WHEN MAKING DESIGN AND MANUFACTURIN ...

    SBIRPhase I1993National Science Foundation
  3. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    Amount: $75,000.00

    STRESSES DUE TO PRESSURE AND REPEATED THERMAL CYCLING CAUSE PROGRESSIVE MATERIAL DAMAGE DURING THE OPERATION OF LWR COMPONENTS AND PIPING SYSTEMS. THE PRESENT PRO POSED RESEARCH WOULD IMPROVE THE ACCU ...

    SBIRPhase II1986Nuclear Regulatory Commission
  4. THERE ARE NUMEROUS COMMERCIAL APPLICATIONS WHICH DEMAND HIGHLY FLEXIBLE, DUCTILE MATERIALS WHICH STILL POSSESS ADEQUATE STRENGTH AND CREEP RESISTANCE.

    Amount: $40,000.00

    THERE ARE NUMEROUS COMMERCIAL APPLICATIONS WHICH DEMAND HIGHLY FLEXIBLE, DUCTILE MATERIALS WHICH STILL POSSESS ADEQUATE STRENGTH AND CREEP RESISTANCE. WE SUGGEST THAT THIS COMBINATION OF PROPERTIES MA ...

    SBIRPhase I1985National Science Foundation
  5. EXTENDED FATIGUE LIFE EVALUATION METHODS FOR AGED LWR COMPONENTS

    Amount: $49,900.00

    N/A

    SBIRPhase I1985Nuclear Regulatory Commission
  6. PROGRAMS FOR NUCLEAR COMPONENTS

    Amount: $50,000.00

    PHASE I OF THE PROPOSED RESEARCH WOULD: 1. EXTEND THE BOUNDING SOLUTIONS FOR STRAIN RANGES, MAXIMUM STRESSES AND ACCUMULATED STRAINS DUE TO INELASTIC CYCLIC LOADS TO INCLUDE STRUCTURAL DISCONTINUITIES ...

    SBIRPhase I1984Department of Energy
US Flag An Official Website of the United States Government