You are here

Remotec Inc.

Company Information
Address
114 Union Valley Rd
Oak Ridge, TN 37830
United States



Information

UEI: N/A

# of Employees: N/A


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. ENVIRONMENTAL HARDENING OF A MOBILE-MANIPULATOR ROBOTIC SYSTEM FOR NUCLEAR ENVIRONMENTS

    Amount: $499,978.00

    THIS PROJECT INVOLVES THE DEVELOPMENT OF A MOBILE ROBOT SYSTEM THAT CAN WITHSTAND VERY HIGH LEVELS OF RADIATION AND VERY HIGH TEMPERATURES. ALTHOUGH MANY ROBOT SYSTEMS ARE PRESENTLY AVAILABLE, NONE CA ...

    SBIRPhase II1993Department of Energy
  2. ENVIRONMENTAL HARDENING OF A MOBILE-MANIPULATOR ROBOTIC SYSTEM FOR NUCLEAR ENVIRONMENTS

    Amount: $50,000.00

    N/A

    SBIRPhase I1992Department of Energy
  3. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    Amount: $494,000.00

    DEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) O ...

    SBIRPhase II1990Department of Energy
  4. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    Amount: $49,887.00

    N/A

    SBIRPhase I1989Department of Energy
  5. AN IN-VESSEL MANIPULATOR CONCEPT DEMONSTRATION FOR THE COMPACT IGNITION TOKAMAK

    Amount: $494,000.00

    THE SPECIALIZED CONFIGURATION OF THE CTT (COMPACT IGNITION TOKAMAK) PLASMA CHAMBER WITH ITS LIMITED ACCESS SPACE, HIGH RADIATION LEVELS, AND HIGH VACUUM CONDITIONS REQUIRES THE DEVELOPMENT OF SPECIAL ...

    SBIRPhase II1988Department of Energy
  6. AN IN-VESSEL MANIPULATOR CONCEPT DEMONSTRATION FOR THE COMPACT IGNITION TOKAMAK

    Amount: $49,823.00

    N/A

    SBIRPhase I1987Department of Energy
  7. A REACTOR CAVITY INSPECTION ROBOT-

    Amount: $196,000.00

    A ROBOTIC INSPECTION SYSTEM WILL BE DEVELOPED TO ELIMINATE THE NEED FOR WORKER ENTRY INTO REACTOR CAVITIES AT PRESSURIZED WATER REACTOR (PWR) PLANTS. CURRENTLY, WORKERS MUST ENTER THE CAVITY TO LOOK F ...

    SBIRPhase II1986Department of Energy
  8. EVALUATION OF ROBOTICS FOR FLANGE BOLTING

    Amount: $225,000.00

    ALL FUSION MACHINE CONCEPTS HAVE ADOPTED A MAINTENANCE PHILOSOPHY FOR REMOVING AND REPLACING OF FAILED COMPONENTS IN ORDER TO MINIMIZE MACHINE DOWNTIME FOR REPAIR. MANY COMPONENTS ARE CONNECTED TO THE ...

    SBIRPhase II1986Department of Energy
  9. THE CONCEPTUAL DESIGN OF A LOW COST MOBILE ROBOT WILL BE PREPARED UTILIZING PROVEN AND EXISTING TECHNOLOGY AND COMPONENT.

    Amount: $49,332.00

    THE CONCEPTUAL DESIGN OF A LOW COST MOBILE ROBOT WILL BE PREPARED UTILIZING PROVEN AND EXISTING TECHNOLOGY AND COMPONENT. REQUIREMENTS WILL BE ESTABLISHED BY SURVEYING POTENTIAL EDUCATIONAL AND LABORA ...

    SBIRPhase I1986Department of Defense Defense Advanced Research Projects Agency
  10. A REACTOR CAVITY INSPECTION ROBOT-

    Amount: $49,642.00

    N/A

    SBIRPhase I1985Department of Energy
US Flag An Official Website of the United States Government