You are here

IMPROVED PIPELINE INSPECTION USING LINESCANNING

Award Information
Agency: National Science Foundation
Branch: N/A
Contract: N/A
Agency Tracking Number: 5264
Amount: $40,000.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1987
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
8710 148th Ave Ne
Redmond, WA 98052
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 () -
Business Contact
 Richard H. Bossi
Title: Senior Engineer
Phone: () -
Research Institution
N/A
Abstract

WELD QUALITY AND WELD INSPECTION ARE MAJOR CONCERNS OF PIPELINE CONSTRUCTION. PRESENT INSPECTION METHODOLOGY REQUIRES SIGNIFICANT TIME DELAYS BETWEEN WELDING AND ACCEPTANCE OF THE WELD. THE COST OF THESE DELAYS IS ENORMOUS CONSIDERING THAT PIPELINE COSTS RUN UPWARDS OF $10 6/MILE AT RATES OF APPROXIMATELY 10 MILES/WEEK. ON-LINE MONITORING CAN BE EXPECTED TO PROVIDE A MINIMUM OF 10% ACCELERATION IN PROJECT SCHEDULE WITH ASSOCIATED BENEFITS IN BETTER INSPECTION QUALITY, RECORD KEEPING AND FEEDBACK TO THE WELDING SYSTEM. AN INNOVATIVE APPROACH TO THIS INSPECTION PROBLEM IS TO FOLLOW THE WELDING PROCESS WITH A LINESCAN X-RAY IMAGING SYSTEM DESIGNED TO OPERATE ON THE HOT WELD. THE X-RAY GENERATOR, X-RAY CONVERTER SCREEN AND LINESCAN CAMERA SYSTEM MUST BE DEVELOPED FOR COMPACT SIZE, SENSITIVITY TO APPLICABLE INSPECTION CODE REQUIREMENTS, AND ENVIRONMENTAL RUGGEDNESS. THE SYSTEM WILL AUTOMATICALLYSCAN THE PIPE WELD FOLLOWING EACH PASS OF THE AUTOMATIC WELDER OR BE USED TO INSPECT THE ROOT PASS AND FINAL PASS OF MANUAL WELDERS. THE LINESCAN DATA WILL BE IN VIDEO FORMAT FOR DISPLAY AND STORAGE. THIS IMAGING FORMAT READILY ALLOWS IMAGE PROCESSING FOR IMPROVED DEFECT ANALYSIS AND FITNESS-FOR-SERVICE ESTIMATIONS. THE PHASE I STUDY WILL ESTABLISH THE REQUIRED PERFORMANCE PARAMETERS AND PROVIDE AN INITIAL DESIGN FOR THE DETECTOR SYSTEM. PHASE II EFFORT WILL DEVELOP A TOTAL SYSTEM.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government