You are here

ADVANCED CUTTER DEVELOPMENT FOR EGRESS BORING MACHINES

Award Information
Agency: Department of Defense
Branch: Air Force
Contract: N/A
Agency Tracking Number: 6567
Amount: $50,000.00
Phase: Phase I
Program: SBIR
Solicitation Topic Code: N/A
Solicitation Number: N/A
Timeline
Solicitation Year: N/A
Award Year: 1987
Award Start Date (Proposal Award Date): N/A
Award End Date (Contract End Date): N/A
Small Business Information
400 Wakara Wy
Salt Lake City, UT 84108
United States
DUNS: N/A
HUBZone Owned: No
Woman Owned: No
Socially and Economically Disadvantaged: No
Principal Investigator
 A MAHYERA
 (801) 584-2416
Business Contact
Phone: () -
Research Institution
N/A
Abstract

CURRENT EGRESS BORING MACHINES, UTILIZING CONVENTIONAL 17-INCH DISC CUTTERS, ARE CAPABLE OF ACHIEVING MAXIMUM ADVANCE RATES OF 80 FEET PER HOUR, BECAUSE OF CUTTER LIMITATIONS. THE AIR FORCE HAS DETERMINED THAT NATIONAL NEEDS REQUIRE SUBSTANTIALLY FASTER BORING RATES. ALSO, IT IS CRUCIAL THAT THE CUTTERS BE CAPABLE OF COMPLETING THE EGRESS SHAFT, WITHOUT ANY MAINTENANCE/REPLACEMENT OF THE CUTTERS. CURRENT CUTTERS, THAT HAVE EVOLVED ESSENTIALLY AS A RESULT OF TRIALAND-ERROR EXPERIMENTS, DESIGN COMPROMISES, AND MANUFACTURING LIMITATIONS, FALL FAR SHORT OF THE AIR FORCE'S GOAL. EXISTING DESIGNS ARE OFTEN SUBJECT TO BOTH BEARING AND CUTTER FAILURES, EVEN WHEN OPERATED BELOW RATED THRUST LEVELS. PROPOSED HEREIN IS AN INNOVATIVE ANALYTICAL-CUM-EXPERIMENTAL STUDY, CENTERED AROUND THE CONCEPT OF A ONE-PIECE HUB/CUTTER RING STRUCTURE. MATERIALS BETTER SUITED FOR THE CUTTER STRUCTURE AND BEARING ELEMENTS HAVE BEEN SELECTED AND DESIGNS PROPOSED FOR EVALUATION IN PHASE I. THE BEST OF THESE WILL BE INCORPORATED TO DEVELOP BASIC CRITERIA TO BE APPLIED FOR DETAILED DESIGN/DEVELOPMENT OF THE CUTTERS IN PHASE II.

* Information listed above is at the time of submission. *

US Flag An Official Website of the United States Government