You are here
Advanced Technology And Research Corporation
UEI: LMFGZ2GKCXR4
# of Employees: 92
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Ship Vibration Mitigation for Additive Manufacturing Equipment
Amount: $1,097,849.00The overall goal of this STTR Phase II project is to develop a process to mitigate the effects of high frequency vibrations for a shipboard material extrusion additive manufacturing (AM) system. NAV ...
STTRPhase II2022Department of Defense Navy -
Launch System for Group 3-5 Unmanned Aerial Vehicles for Land- and Sea-Based Operations
Amount: $812,191.00The overall goal of this SBIR Phase II project is to further develop the Modular Kinetic Launch System (MKLS) that will allow the Navy to launch large Group 3-5 Unmanned Aerial Vehicles (UAV) from the ...
SBIRPhase II2022Department of Defense Navy -
Launch System for Group 3-5 Unmanned Areial Vehicles for Land- and Sea Based Operations
Amount: $239,533.00The overall goal of this SBIR Phase I project is to develop a concept to launch large Group 3-5 Unmanned Aerial Vehicles (UAV) from the ESB Ship. The launch system must be able to handle 6,000 lb fi ...
SBIRPhase I2021Department of Defense Navy -
Recovery and Handling of Group 3 through Group 5 Unmanned Aerial Vehicles Aboard Navy's Expeditionary Sea Base
Amount: $140,000.00The goal of this SBIR program is to operate large Unmanned Aerial Vehicles (UAV) from ships other than aircraft carriers. The Navy desires a system capable of recovering fixed-wing, jet-powered UAVs, ...
SBIRPhase I2021Department of Defense Navy -
Unmanned Vehicle Launch & Recovery (L&R) for MK VI Patrol Boats
Amount: $139,572.00An innovative system called Intuitive Robotic Launch and Recovery System (IRLRS) is proposed to safely launch, recover, and stow two MK 18 Mod 2 UUVs from the MK VI Patrol Boat in sea conditions up to ...
SBIRPhase I2020Department of Defense Navy -
Ship Vibration Mitigation for Additive Manufactruring Equipment
Amount: $239,942.00The overall goal of this STTR Phase I project is to develop a concept to mitigate the effects of motion/vibration for a shipboard material extrusion additive manufacturing (AM) system. NAVSEA has be ...
STTRPhase I2020Department of Defense Navy -
Active Motion-Compensation Technology for Roll-On/Roll-Off Cargo Vessel Discharge to Floating Platforms
Amount: $900,390.00The overall goal of this SBIR Phase II Reachback project is to develop an enabling technology for shipboard additive manufacturing. NAVSEA has been installing advanced manufacturing equipment, includi ...
SBIRPhase II2019Department of Defense Navy -
Innovative Material Handling System for the Expeditionary Mobile Base (ESB) Class Ship
Amount: $1,499,466.00ATR proposes the development of an innovative Advanced Dual-Purpose Elevator System (ADPES) that can be installed on an Expeditionary Base Mobile (ESB) so that aircraft and cargo can be transferred fr ...
STTRPhase II2019Department of Defense Navy -
Adaptable Boat Launch and Recovery System
Amount: $1,499,898.00An innovative system called Adaptable Boat Deployment and Retrieval System (ABDRS) is proposed to be developed to safely handle a variety of current and future crafts and other assets from the boat ba ...
SBIRPhase II2019Department of Defense Navy -
Adaptable Boat Launch and Recovery System
Amount: $124,876.00An innovative system called Adaptable Boat Deployment and Retrieval System (ABDRS) is proposed to safely handle a variety of current and future crafts and other assets from the boat bay of DDG 1000 cl ...
SBIRPhase I2018Department of Defense Navy