You are here
DCS CORP.
UEI: FJS8P9C6B368
# of Employees: 450
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
SH-60B Helicopter FLIR Training Aid
Amount: $149,951.00The mission requirements and operational environments of todays tactical fighters tax the cognitive skills of the aircrew and the advent of new and more sophisticated systems have rapidly increased th ...
SBIRPhase II1995Department of Defense Navy -
ROOM TEMPERATURE IR FOCAL PLANE ARRAY IMAGING RADIOMETER
Amount: $56,679.00DCS will design a room temperature imaging radiometer for use in aircraft engine testing at AEDC. The radiometer will be a modification of an existing uncooled thermal imager; either Texas Instruments ...
SBIRPhase I1994Department of Defense Air Force -
SH-60B Helicopter FLIR Training Aid
Amount: $63,606.00N/A
SBIRPhase I1994Department of Defense Navy -
COVERT TERRAIN/OBSTACLE AVOIDANCE SYSTEM FOR HELICOPTERS
Amount: $569,446.00DCS WILL CONDUCT A STRUCTURED AND SYSTEMATIC RESEARCH PROGRAM INTO NEAR AND MID-TERM OBSTACLE AND TERRAIN AVOIDANCE TECHNOLOGIES. THE GOAL WILL BE TO IDENTIFY THE MOST PROMISING SENSOR TECHNOLOGIES AN ...
SBIRPhase II1993Department of Defense Army -
Low Intensity Conflict Aerosol Munition
Amount: $46,860.00Aerosol sprays of paint, epoxy, and other substances can be dispensed by mines and other munitions to disable hostile sensors, vehicles, and weapon systesm. For example, a paint-filled aerosol mine co ...
SBIRPhase I1993Department of Defense Army -
USE OF HELMET MOUNTED DISPLAYS ON THE E-2C
Amount: $49,878.00N/A
SBIRPhase I1993Department of Defense Navy -
COVERT TERRAIN/OBSTACLE AVOIDANCE SYSTEM FOR HELICOPTERS
Amount: $49,786.00N/A
SBIRPhase I1992Department of Defense Army -
ESTIMATING SOFTWARE EFFORT COMPLETION
Amount: $49,998.00THE PROPOSED PROJECT "ESTIMATING SOFTWARE EFFORT COMPLETION"INTENDS TO DEVELOP AND EXTEND A TECHNOLOGY TO AVOID COSTLY SOFTWARE PROJECT BUDGET OVERRUNS. THE TECHNOLOGY, EFFORT COMPLETION ESTIMATING, I ...
SBIRPhase I1991National Science Foundation -
AH-IW ATTACK HELICOPTER COCKPIT WORKLOAD REDUCTION
Amount: $9,972.00THE COMPLEX AVIONICS AND SOPHISTICATED TACTICS NECESSARY TO DELIVERPRECISION GUIDED MUNITIONS AND COUNTER MODERN MILITARY THREATS PLACE A SIGNIFICANT BURDEN ON THE CAPABILITIES OF THE ATTACK HELICOPTE ...
SBIRPhase I1991Department of Defense Navy -
AUTOMATED FORWARD LOOKING INFRARED (FLIR) RESOLUTION MEASUREMENT DEVELOPMENT
Amount: $49,266.00MINIMUM RESOLVABLE TEMPERATURE (MRT) IS PROBABLY THE BEST KNOWN ANDMOST USEFUL FLIR SPECIFICATION PARAMETER. MRT IS A FIGURE OF MERIT WHICH MEASURES BOTH THE SENSITIVITY AND SPATIAL RESOLUTION OF A FL ...
SBIRPhase I1991Department of Defense Navy