You are here
DFUZION, INC.
UEI: TK4YMFWLZ9U1
# of Employees: 2
HUBZone Owned: No
Socially and Economically Disadvantaged: No
Woman Owned: No
Award Charts
Award Listing
-
Ride Performance Assessment System (RPAS)
Amount: $300,165.00To address FRA’s requirements of measuring rail vehicle suspension displacement and integrating this into existing accelerometer-based ride quality systems, dFuzion proposes the development of a com ...
SBIRPhase II2017Department of Transportation -
Portable Rail Suspension Displacement Monitoring System
Amount: $149,999.00dFuzion proposes the development of a comprehensive Ride Performance Assessment System (RPAS). RPAS leverages the investment and research already made by FRA in its sponsored portable ride quality met ...
SBIRPhase I2015Department of Transportation -
Non-contact Track Gage Measurement System (NC-TGMS)
Amount: $99,990.00One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track sa ...
SBIRPhase I2009Department of Transportation -
Ultra Portable Ride Quality Meter
Amount: $6,090.00Although the market clearly has several ride quality meters commercially available, the FRA wishes to investigate the possibility of designing a very compact and ultra portable ride quality meter (UPR ...
SBIRPhase I2008Department of Transportation -
Wireless Passenger Communications System
Amount: $74,981.00In 2006, the FRA introduced a Notice of Proposed Rulemaking (NPRM) to enhance intra-train communications on Tier I passenger cars. This rulemaking would promote the safety of passengers and crew memb ...
SBIRPhase I2008Department of Transportation -
Ultra Portable Ride Quality Meter
Amount: $300,175.00The Ultra Portable Ride Quality Meter (UPRQM) is a cost-effective, flexible tool that can evolve (with minimal effort) as new GPS and accelerometer devices become commercially available. Each generat ...
SBIRPhase II2008Department of Transportation -
Intelligent Sensor Distribution Architecture (ISDA)
Amount: $99,987.00dFuzion engineers have worked with soldiers in several military exercises, including Naval Warfare Development Command¿s (NWDC) Fleet Battle Experiments and the Joint Forces Command¿s (JFCOM) Forwar ...
SBIRPhase I2006Department of Homeland Security