You are here

GLOYER-TAYLOR LABORATORIES INC

Company Information
Address
112 MITCHELL BLVD
TULLAHOMA, TN 37388-4002
United States


https://www.gtlcompany.com

Information

UEI: RPLDKCP343S9

# of Employees: 32


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. Morphing Rocket Throat

    Amount: $149,985.00

    Using modern additive manufacturing technology, GTL proposes to develop a geometry based thermal management system to enable the development of a Morphing Rocket Throat. With this capability, rocket m ...

    STTRPhase I2022Department of Defense Missile Defense Agency
  2. Additively Produced Telescope Mirrors

    Amount: $149,999.00

    In this effort GTL proposes to develop an additive production system for telescope mirrors leveraging previous research efforts for DARPA, MDA, and NASA. The proposed production method allows for a wi ...

    STTRPhase I2022Department of Defense Air Force
  3. Composite Torpedo Fuel Tank Phase II

    Amount: $599,990.00

    In this phase I proposal GTL will leverage its experience in innovative composite tank design and production for spacecraft and propulsion systems in order to produce a high-performance composite torp ...

    SBIRPhase II2022Department of Defense Navy
  4. Ultralight Dewar Phase II

    Amount: $749,998.00

    Ground based and airborne infrared astronomy is limited by atmosphere and telescope heat. These systems require a cold helium cooling of the instruments with a dewar for cryogen storage. Given the lim ...

    SBIRPhase II2021National Aeronautics and Space Administration
  5. RCS Gas Generation System

    Amount: $124,998.00

    In this phase I effort a design for a gas generation system architecture tailored for RCS gas accumulators on lander vehicles with ultra-low mass and thermal mass BHL components will be produced and P ...

    SBIRPhase I2021National Aeronautics and Space Administration
  6. High-Temperature Sensors

    Amount: $1,488,709.00

    Hypersonic vehicles and weapons systems offer the ability to quickly strike across the globe and are essential for the future of the U.S. armed forces. Operating these systems at hypersonic speeds pre ...

    SBIRPhase II2021Department of Defense Defense Advanced Research Projects Agency
  7. Low Boiloff Transfer Lines

    Amount: $749,996.00

    In this phase I effort ultra-light BHL composite transfer lines were shown to reduce chill-down time over 90% compared to equivalent stainless steel lines. BHL tubes have frac14; the mass of comparabl ...

    SBIRPhase II2020National Aeronautics and Space Administration
  8. Ultralight Dewar

    Amount: $124,996.00

    GTLrsquo;s ultralightweight BHLtrade; dewar provides dramatically reduced mass, and increased performance over metal dewars. In cryogenic propellant storage systems, BHL has a demonstrated mass reduct ...

    SBIRPhase I2020National Aeronautics and Space Administration
  9. Composite Facility Components

    Amount: $124,995.00

    nbsp;For over 10 years GTL has been developing novel rocket system components. Originally funded by DARPA, with additional funding by NASA, GTL has developed a novel composite system (BHLtrade;) for c ...

    SBIRPhase I2020National Aeronautics and Space Administration
  10. Standards for Impure Propellants

    Amount: $124,995.00

    In Situ Resource Utilization (ISRU) is at the forefront of near-term lunar and Martian missions.nbsp; While many technologies and program strategies focus in ISRU, propellant production substantially ...

    STTRPhase I2020National Aeronautics and Space Administration
US Flag An Official Website of the United States Government