You are here

KTECH CORP.

Company Information
Address
1300 Eubank Blvd. SE
Albuquerque, NM -
United States



Information

UEI: N/A

# of Employees: 440


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: No

Woman Owned: No



Award Charts




Award Listing

  1. FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST

    Amount: $49,943.00

    N/A

    SBIRPhase I1990Department of Defense Defense Threat Reduction Agency
  2. SHOCK HARDENED ON-BOARD DATA ACQUISITION SYSTEM

    Amount: $49,948.00

    N/A

    SBIRPhase I1989Department of Defense Navy
  3. DEVELOPMENT OF FREE FIELD TIME-OF-ARRIVAL GAUGES FOR LOW OVERPRESSURES

    Amount: $49,924.00

    THE PROPOSED EFFORT WILL DEMONSTRATE THE FEASIBILITY OF USING THE PIEZOELECTRIC POLYMER POLYVINYLIDENE FLUORIDE (PVF[2]) AS A LOW OVERPRESSURE (1-30PSI) TIME-OF-ARRIVAL (TOA) TRANSDUCER. A SERIES OF S ...

    SBIRPhase I1988Department of Defense Air Force
  4. INTEGRAL BLAST PRESSURE AMPLIFIER

    Amount: $49,963.00

    AN INTEGRAL BLAST PRESSURE AMPLIFIER IS PROPOSED. AFTER FULL DEVELOPMENT, THE DEVICE WILL BE CAPABLE OF MAKING AIR BLAST MEASUREMENTS IN SEVERE ENVIRONMENTS. DESIGN GOALS INCLUDE SMALL SIZE, LESS THAN ...

    SBIRPhase I1988Department of Defense Air Force
  5. FEASIBILITY OF A HIGH TOTAL DOSE GAMMA SIMULATOR FOR TREE VULNERABILITY AND SURVIVABILITY STUDIES

    Amount: $43,675.00

    N/A

    SBIRPhase II1987Department of Defense Defense Threat Reduction Agency
  6. SELF-CONTAINED INSTRUMENTATION SYSTEM

    Amount: $489,000.00

    THE PROPOSED DEVELOPMENT OF A SELF-CONTAINED INSTRUMENTATION SYSTEM IS PRESENTED IN THIS DOCUMENT. THE SYSTEM WOULD BE CAPABLE OF MAKING ACCELERATION, PRESSURE OR SOIL STRESS MEASUREMENTS IN SEVERE EN ...

    SBIRPhase II1986Department of Defense Air Force
  7. TESTING CAPABILITY AND DEBRIS ELIMINATION

    Amount: $49,322.00

    PULSED RADIATION SOURCES (PRS) SUCH AS BLACKJACT 5 AND DOUBLE EAGLE CAN PRODUCE COPIOUS LINE X-RAY OUTPUTS IN THE FEW KEV RANGE. THESE X-RAYS ARE USED TO IRRADIATE SAMPLES AND IT IS DESIRABLE TO USE A ...

    SBIRPhase I1986Department of Defense Defense Threat Reduction Agency
  8. FEASIBILITY OF A HIGH TOTAL DOSE GAMMA SIMULATOR FOR TREE VULNERABILITY AND SURVIVABILITY STUDIES

    Amount: $47,016.00

    N/A

    SBIRPhase I1986Department of Defense Defense Threat Reduction Agency
  9. SELF-CONTAINED INSTRUMENTATION SYSTEM

    Amount: $49,972.00

    N/A

    SBIRPhase I1985Department of Defense Air Force
US Flag An Official Website of the United States Government