You are here

Sharma & Associates, Inc.

Company Information
Address
5810 South Grant St
Hinsdale, IL 60521
United States


http://www.sharma-associates.com

Information

DUNS: 884551540

# of Employees: 22


Ownership Information

HUBZone Owned: No

Socially and Economically Disadvantaged: Yes

Woman Owned: No



Award Charts




Award Listing

  1. Improved Condition Monitoring of Traction Motors

    Amount: $137,283.56

    Identification of defects and incipient failures before the breakdown of the equipment is recognized as an important maintenance activity in the railroad industry to improve efficiency and safety of t ...

    SBIRPhase I2020Department of Transportation
  2. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    Amount: $271,301.00

    The Next Generation Equipment Committee (NGEC) developed a standard for specifying the use of an Ethernet based digital train line (DTL) network to replace the COMM line for passenger trains. These sp ...

    SBIRPhase II2017Department of Transportation
  3. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    Amount: $149,411.00

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equ ...

    SBIRPhase I2015Department of Transportation
  4. Next Generation Freight Truck for Autorack Cars

    Amount: $149,706.00

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to h ...

    SBIRPhase I2015Department of Transportation
  5. Electronically Controlled Pneumatic Brake System Emulator Development

    Amount: $149,444.53

    Migration of the vehicle fleet from the current, pneumatic-only, automatic air brake (AAB) system to ECP presents a significant challenge due to the systems’ inherent operational incompatibility. Th ...

    SBIRPhase I2012Department of Transportation
  6. Advanced Truck for High Speed Freight Operations

    Amount: $197,614.00

    During Phase 1 of the project, Sharma & Associates, Inc. developed a concept for high speed freight truck intended for 70-ton, regular freight and bi-modal operation, at speeds up to 150 mph. The tru ...

    SBIRPhase II2008Department of Transportation
  7. Advanced Truck for High Speed Freight Operations

    Amount: $605,175.00

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The tr ...

    SBIRPhase II2004Department of Transportation
  8. N/A

    Amount: $99,635.00

    There is a growing trend towards the use of ¿Car-Less¿ technology, where a rail-car is not needed to transport road-haul trailers over rail: Trailers operate in the usual manner over highways, ...

    SBIRPhase I2001Department of Transportation
  9. N/A

    Amount: $0.00

    N/A

    SBIRPhase I2000Department of Transportation
  10. N/A

    Amount: $244,794.00

    N/A

    SBIRPhase II2000Department of Transportation
US Flag An Official Website of the United States Government