You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Long Range ROW Detection and Warning System

    SBC: R-DEX SYSTEMS, INC.            Topic: 151FR7

    R-DEX Systems proposes to develop the TrackMap System, an innovative and groundbreaking long-range detection and warning system (DWS) for the detection of unlawful targets on the railroad right of way (ROW). TrackMap will leverage low-cost radar sensors, proven software, and high-performance embedded processing to enable the Federal Railroad Administration (FRA) and its safety partners to signific ...

    SBIR Phase I 2015 Department of Transportation
  2. Transportation Vehicle Waste Heat Recovery System

    SBC: MMPG LLC            Topic: 101FT1

    A one-cylinder diesel engine will be modified to achieve a 20% to 40% improvement in fuel efficiency. This will be accomplished by insulating the interior of the combustion chamber with a proprietary thermal insulating material. Heat normally transferred to the engine coolant through the walls of the head, cylinder and piston will be retained within the combustion chamber where it is available t ...

    SBIR Phase I 2010 Department of Transportation
US Flag An Official Website of the United States Government