You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Encapsulated Particles: Improved Catalyst for the Production of Methanol from CO

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    65877 The generation of high power, high frequency microwaves, using conventional sources such as klystrons or traveling wave amplifiers, requires that very high field gradients be sustained in small output cavities for a long duration. A high-current electron beam source, and thus a high power modulator, is also required. This project will develop a doped diamond switch as a pulse compressor el ...

    SBIR Phase I 2001 Department of Energy
  2. Ocean Current Power Generator

    SBC: Abacus Controls, Inc.            Topic: N/A

    60165 The Gulf Stream off the southeastern coast of Florida is a natural source of renewable energy that is ready for development using today¿s technology. Unlike other renewable sources, water flows 24 hours a day and can be counted on as a base source of electric power. This project will utilize the Underwater Electric Kite, which has been tested in the Niagara River and is ready for o ...

    SBIR Phase II 2001 Department of Energy
  3. Ocean Current Power Generator

    SBC: Abacus Controls, Inc.            Topic: N/A

    60165 The Gulf Stream off the southeastern coast of Florida is a natural source of renewable energy that is ready for development using today¿s technology. Unlike other renewable sources, water flows 24 hours a day and can be counted on as a base source of electric power. This project will utilize the Underwater Electric Kite, which has been tested in the Niagara River and is ready for o ...

    SBIR Phase I 2001 Department of Energy
  4. Error-reduction in dipole-source localization models

    SBC: ABRATECH CORPORATION            Topic: N/A

    DESCRIPTION(Adapted from applicant's abstract): Multiple-channel brain evoked-response data is often recorded from the scalp, either electrically, or magnetically. The analysis of this multi-channel data commonly utilizes mathematical models, which assume that the neural generators of the evoked-respons ...

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
  5. N/A

    SBC: ABRATECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
  6. N/A

    SBC: ABRATECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Health and Human ServicesNational Institutes of Health
  7. Pediatrician ADHD Media Support Package for Parents

    SBC: ACADEMIC EDGE, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): Children with ADHD are at significant risk for failing to complete high school and as many as 25 percent develop chronic patterns of antisocial behavior that persist into adulthood. Primary care providers--the practitioners who evaluate and treat the vast majority of children with ADHD--often fail to uti ...

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
  8. Classroom Support of ADHD Social Skills Development

    SBC: ACADEMIC EDGE, INC.            Topic: N/A

    The purpose of this project is to design, develop, and evaluate an Intergrated Media Intervention (IMI) that will assist teachers, school counselors, group facilitators and related personnel to foster the development of age-appropriate social problem-solving skills by children and adolescents with disruptive behavior disorders such as ADHD, ODD, and CD. The IMI is a package of classroom implement ...

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
  9. Virtual-Impact Particle Sizing for Precursor Powders of Nb3Sn and Bi-2212 Superconductors

    SBC: Accelerator Technology Corporation            Topic: N/A

    Particle size distribution is one of the critical parameters in fabricating high-performance, fine-filament superconductors of Nb3Sn and Bi-2212 using the powder-in-tube (PIT) technique. Even a few large particles in the tubes of a multi-filament PIT billet will limit the size of the drawing or rolling to finish dimension. Since performance scales with the number of filaments in a strand, improv ...

    STTR Phase I 2001 Department of Energy
  10. Catheter to Thermally Classify Atherosclerotic Plaque

    SBC: ACCUMED SYSTEMS, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): Unstable plaque is well established as producing high risk for sudden myocardial infarction (MI), through plaque rupture and subsequent thrombotic response, or thrombosis generated at the inflamed plaque surface. It cannot be located by angiography, and has been estimated to account for 60-70 percent of fatal MIs and up t ...

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
US Flag An Official Website of the United States Government