You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPOSITE MATERIAL DESIGNS FOR ASROC LAUNCHER MK112

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  2. WEIGHT, COMPACT SOLAR WATER DISTILLATION PURIFICATION DEVICE

    SBC: Abel Company            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  3. N/A

    SBC: ABIOMED, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  4. JOINED WING AIRCRAFT

    SBC: Aca Industries, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  5. AND LINEAL/ROTATIONAL MECHANICAL ADMITTANCE

    SBC: Acoustical Research & Applicat            Topic: N/A

    APPLICATION OF MULTI-TERMINAL NETWORK THEORY TO VIBRATION PROBLEMS REQUIRES KNOWLEDGE OF THE POINT AND POINT-TO-POINT MECHANICAL ADMITTANCE MATRICES AT THE MECHANICAL TERMINALS OF THE STRUCTURES TO BE CONNECTED TOGETHER. THE ADMITTANCE MATRICES CONTAIN ELEMENTS RELATING LINEAL MOTIONS AND FORCES(LINEAL ADMITTANCES), LINEAL MOTIONS AND MOMENTS (LINEAL/ ROTATIONAL ADMITTANCES), ROTATIONAL MOTIONS AN ...

    SBIR Phase I 1983 National Science Foundation
  6. AUTOMATIC CONTAMINATION EVALUATOR FOR OPTICAL SURFACES

    SBC: Acton Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  7. EMISSION STRATEGIES AND OPERATIONS IN MODERN NAVAL COMBAT SYSTEMS

    SBC: Adler Consultants, Inc.            Topic: N/A

    Not Available

    SBIR Phase I 1983 Department of DefenseNavy
  8. TECHNOLOGY FOR SPACERCRAFT

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    WE WILL PERFORM RESEARCH INTO AN OPTICAL MEMORY DEVICE TECHNOLOGY WHICH SHOWS THE POTENTIAL A OF PROVIDING A REPLACEMENT FOR MECHANICALMAGNETIC TAPE RECORDERS CURRENTLY USED IN SPACECRAFT, BUT WITH SIGNIFICANTLY HIGHER RELIABILITY. THE TECHNOLOGY IS BASED ON THE PHOTON ECHO PHEOMENON, AND PROVIDES STOAGE CAPACITY INCEASES (UP 10 (15) BITS) AS WELL AS THE REQUIRED CONTINUOUS OPERATION OF SEVEN YEAR ...

    SBIR Phase I 1983 Department of DefenseAir Force
  9. MEMORY MODULE, IN THE PETABIT (10[15]) TO EXABIT (10[18] BIT) RANGE, BASED ON PHOTON ECHO PHENOMENON, FOR SYSTEMS INTEGRATION INTO CONTEMPORARY COMPUTER CONFIGURATIONS BUT MORE IMPORTANTLY TO BE THE MEMORY COMPONENT IN FUTURE CONFIGURATIONS WHICH IS

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    MEMORY MODULE, IN THE PETABIT (10[15]) TO EXABIT (10[18] BIT) RANGE, BASED ON PHOTON ECHO PHENOMENON, FOR SYSTEMS INTEGRATION INTO CONTEMPORARY COMPUTER CONFIGURATIONS BUT MORE IMPORTANTLY TO BE THE MEMORY COMPONENT IN FUTURE CONFIGURATIONS WHICH IS COMMENSURATE WITH RESULTS OF CURRENTADVANCED R & D OF OTHER COMPONENTS, E.G., ULTRA VLSI (VERY LARGE SCALE INTEGRATED CIRCUITS) BY MANY COMPANIES WORL ...

    SBIR Phase I 1983 Department of Health and Human Services
  10. TRACKING PROGRESSIVE FRACTURE\TOWARDS RETIREMENT FOR CAUSE

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
US Flag An Official Website of the United States Government