You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
FACT: Fast and Accurate Detection of Counterfeit Microelectronics
SBC: Caspia Technologies LLC Topic: DHS221003As outsourced microelectronic manufacturing grows, the safety and security of U.S. consumers becomes increasingly threatened by potential counterfeit electronics. Current counterfeit inspection techniques are labor intensive, time consuming, and impractical to use by field agents located on remote sites, away from major facilities, and with limited expertise. The proposed work, Fast and Accurate D ...
SBIR Phase II 2023 Department of Homeland Security -
Geothermal Energy Generation Using Dormant Wells in High-Temperature Shale Sedimentary Areas
SBC: RENASCENT ENERGY MANAGEMENT LLC Topic: C5513aC55-13a-270233The project embodies a field demonstration of a novel geothermal process via water injection into a shut- in existing well (already drilled & hydraulically fractured, and shut-in) for a short period, and then that injected water, having been heated by contacting the subsurface rock, is produced back to the surface (via the same well through which it was injected). This intermittent p ...
SBIR Phase I 2023 Department of Energy -
Network Risk Assessment Toolkit (NetRAT)
SBC: PROTECTION ENGINEERING CONSULTANTS LLC Topic: C5501bC55-01b-270620Infrastructure systems such as electricity distribution and transmission grids, transportation networks, and water or oil/gas distribution pipelines are critical from an economic and national security standpoint. Expedited risk quantification of infrastructure network systems is of utmost importance for resiliency assessment against natural or man-made hazards. Currently available te ...
SBIR Phase I 2023 Department of Energy -
SimPulse: Scalable Hydraulic Transients in 21st Century Piping Systems
SBC: THE EQUITY TECHNOLOGY GROUP INCORPORATED Topic: C5501bC55-01b-270667-AbstractThe world has started to transition to using hybrid-energy systems. As this transition progresses, many companies have started to re-purpose existing, aging assets. This re-purposing of aging assets can be prominently seen in the areas of biofuels processing and in hydrogen and carbon dioxide transmission pipelines. A core issue with repurposing aging assets lies in the ofte ...
SBIR Phase I 2023 Department of Energy -
Optimizing Solid Electrolyte and Air Electrodes for High Energy, 3D Na-Air Battery
SBC: DAYLYTE, INC. Topic: C5318cC53-18c-271136The lack of affordable large-scale batteries makes electric vehicles too expensive for most consumers and makes renewable energy storage financially impractical for almost everyone. Although Li-ion battery prices have fallen over the past three decades, they are threatening to rise higher as Li-ion production for electric vehicles is predicted to consume the world’s high-grade coba ...
SBIR Phase II 2023 Department of Energy -
Electrodeposited Overlays for Improved Durability of Nuclear Reactors
SBC: Faraday Technology, Inc. Topic: C4720aC47-20a-271162Next generation molten salt reactor systems require the development of scalable processes to apply bimetallic structures of corrosion-resistant materials onto boiler and pressure vessels. This will improve the corrosion resistance, reliability, and lifetime of components in liquid-fuel and liquid-cooled reactors. Molten salts enable economical operation due to higher temperatures (>6 ...
SBIR Phase II 2023 Department of Energy -
Rare Earth Metals Recycling by Hydrogen Reduction of REOs/Salts
SBC: POLYKALA TECHNOLOGIES LLC Topic: C5127aC51-27a-271194Rare earth elements (REEs) are crucial to the production of green energy motors in wind turbines, hybrid cars, electric vehicles, and electronic devices. REEs are also widely used in defense systems, including precision-guided munitions, radar systems, avionics, night vision equipment, satellites and guided missiles. China dominates the REEs production and exports and is continuing t ...
SBIR Phase II 2023 Department of Energy -
SMART-PETSc: Smart Middleware for Accelerating PETSc
SBC: X-SCALESOLUTIONS LLC Topic: C5302aC53-02a-271265Efficiently parallelizing algebraic solvers such as PETSc would vastly improve the performance of many critical scientific end applications. The major challenge in harnessing GPU systems for such algebraic solvers is simultaneously using all hardware resources via an optimized MPI environment, specifically instruction scheduling (i.e., kernel launches), computation, and communication ...
SBIR Phase II 2023 Department of Energy -
High Performance Scintillator and Beam Monitoring System
SBC: Integrated Sensors, LLC Topic: C4731dC47-31d-271361Nuclear physics has a need for new enabling materials and technologies for next-generation detectors at DOE particle accelerator research facilities. Improvements are needed in high-performance scintillator materials for detecting and counting charged particles in real-time over a wide range of energies and beam intensities. Integrated Sensors, LLC has demonstrated two new types of h ...
SBIR Phase II 2023 Department of Energy -
Novel Design for Passenger Railcar Retention Systems
SBC: PROTECTION ENGINEERING CONSULTANTS LLC Topic: 23FR2Additional passenger fatalities and injuries can occur in rollover-type derailment accidents due to failures of glazing retention mechanisms on passenger railcars. In recent accidents, a key failure mode is shearing off the external rubber gasket that secures the glazing panes as the side of the railcar drags along the ground. Once the gasket fails, the glazing pane is pushed inside, leaving an op ...
SBIR Phase I 2023 Department of Transportation