You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Electrochemical Micro-Capacitors Utilizing Carbon Nanostructures
SBC: ENGENIUSMICRO LLC Topic: DMEA13B001Electrochemical double-layer (ECDL) capacitors have tremendous potential as high-power delivery energy storage elements in low-volume and low-weight microelectronics systems. ECDL electrodes based on nanostructured carbon offer the potential for exception
STTR Phase I 2014 Department of DefenseDefense Microelectronics Activity -
THREE-DIMENSIONAL UNSATURATED GROUND WATER FLOW
SBC: SIMONS, LI AND ASSOCIATES INC. Topic: N/ATHIS PROPOSAL IS TO MODEL THE TRANSPORT OF POLLUTANTS IN UNSATURATED POROUS MEDIA FLOW. THE MODEL TO BE USED WILL BE A THREE-DIMENSIONAL UNSATURATED-SATURATED FLOW MODEL COUPLED WITH A THREE-DIMENSIONAL CONVECTION-DISPERSION EQUATION. THE MODEL WILL BE IMPLEMENTED ON A CDC CYBER 205 SUPERCOMPUTER WHICH HAS THE SIZE AND SPEED NECESSARY TO MAKETHIS APPROACH A REALITY. PHASE I OF THE PROJECT WILL BE ...
SBIR Phase I 1983 Department of the Interior -
N/A
SBC: Water Engineering & Technology Topic: N/AQUANTITATIVE GEOMORPHIC GUIDELINES ARE LACKING FOR THE DESIGN AND CONSTRUCTION OF RECLAIMED SURFACE MINE TOPOGRAPHY. STABLE TOPOGRAPHY IS NECESSARY FOR RECLAIMED AREAS IN ORDER TO REDUCE SEDIMENT POLLUTION TO OFFSITE AREAS, TO ALLOW RAPID DEVELOPMENT OF VEGETATION, AND TO MEET STATE AND FEDERAL LAWS. GUIDELINES FOR GEOMORPHIC DESIGN OF STREAM CHANNEL NETWORKS WILL BE DEVELOPED FROM ANALYSIS OF NAT ...
SBIR Phase I 1984 Department of the Interior