List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. APTEK, AS PRIME CONTRACTOR, IN CONJUNCTION WITH GENERAL ELECTRIC COMPANY AND SRI INTERNATIONAL, AS SUBCONTRACTORS, WILL CONDUCT A STUDY TO IDENTIFY AND INVESTIGATE CANDIDATE OVERLAY MATERIALS VERSUS SYSTEM REQUIREMENTS FOR BOTH ACTIVE AND PASSIVE DECOYS.

    SBC: APTEK, Inc.            Topic: N/A

    APTEK, AS PRIME CONTRACTOR, IN CONJUNCTION WITH GENERAL ELECTRIC COMPANY AND SRI INTERNATIONAL, AS SUBCONTRACTORS, WILL CONDUCT A STUDY TO IDENTIFY AND INVESTIGATE CANDIDATE OVERLAY MATERIALS VERSUS SYSTEM REQUIREMENTS FOR BOTH ACTIVE AND PASSIVE DECOYS. OVERLAY MATERIALS DEVELOPED BY THE NH&S COMMUNITY WILL BE CONSIDERED AS WELL AS PREVIOUSLY UNEVALUATED CANDIDATES SUCH AS RARE EARTH BORIDES. THE ...

    SBIR Phase I 1985 Department of DefenseDefense Threat Reduction Agency
  2. SIGNIFICANT ADVANCES HAVE BEEN MADE RECENTLY IN THE DISCRETE ELEMENT METHOD FOR THE ANALYSIS OF DYNAMIC EFFECTS ON UNDERGROUND STRUCTURES, VESSELS IN ICE INFESTED WATERS AND IN THE GENERAL SOLUTION OF DISCONTINUUM AND FRACTURING OF STRUCTURAL BODIES UPON

    SBC: Applied Mechanics Inc            Topic: N/A

    SIGNIFICANT ADVANCES HAVE BEEN MADE RECENTLY IN THE DISCRETE ELEMENT METHOD FOR THE ANALYSIS OF DYNAMIC EFFECTS ON UNDERGROUND STRUCTURES, VESSELS IN ICE INFESTED WATERS AND IN THE GENERAL SOLUTION OF DISCONTINUUM AND FRACTURING OF STRUCTURAL BODIES UPON IMPACT. THE METHOD HAS UNIQUE ADVANTAGES OVER THE FINITE ELEMENT METHOD PARTICULARLY FOR DYNAMIC ANALYSIS OF UNDERGROUND EXCAVATIONS IN ROCK. CUR ...

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  3. THIS ACTIVITY WILL DEVELOP AND DEMONSTRATE A METHOD TO SUPERIMPOSE A SIGNAL ON DATA CHANNELS WHICH WILL IDENTIFY THE PARTICULAR DATA CHANNEL.

    SBC: APTEK, Inc.            Topic: N/A

    THIS ACTIVITY WILL DEVELOP AND DEMONSTRATE A METHOD TO SUPERIMPOSE A SIGNAL ON DATA CHANNELS WHICH WILL IDENTIFY THE PARTICULAR DATA CHANNEL. THE SIGNAL WILL BE GENERATED AS A BINARY CODE. INCLUDED WILL BE THE DESIGN, DEVELOPMENT AND TESTING OF ONE OR MORE PROTOTYPE CHANNEL IDENTIFIER SYSTEM(S) TO INTERFACE WITH REPRESENTATIVE DATA ACQUISITION SYSTEM(S). PRODUCTION CONFIGURATION AND COST INFORMATI ...

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  4. EXAMINATION OF R-WIRE BURST USING A HYDRODYNAMIC MODEL

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    STUDIES WILL BE PERFORMED TO EXAMINE THE FEASIBILITY OF USING FAIRLY HIGH RESISTANCE CABLES (R-WIRES) AS A MEANS TO MITIGATE THE LARGE SREMP TRANSIENTS WHICH ARE EXPECTED IN BURIED AND OVERHEAD POWER-LINE DISTRIBUTIONS. THE ANALYSIS WILL UTILIZE COMPUTER CODES WHICH SOLVE THE ONE-DIMENSIONAL TRANSMISSION LINE EQUATIONS IN THE TIME DOMAIN USING FINITE DIFFERENCE TECHNIQUES. A MAJOR PORTION OF THIS ...

    SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency
  5. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  6. ELECTROMAGNETIC GAGE TECHNIQUES FOR HEST MEASURMENTS

    SBC: Sunburst Recovery Inc            Topic: N/A

    DATA ON THE RESPONSE OF MATERIALS AND STRUCTURES TO NUCLEAR WEAPONS IS CRITICAL TO THE IMPROVED DESIGN OF WEAPONS AND DEFENSE SYSTEMS. MUCH OF THIS DATA IS OBTAINED IN HIGH EXPLOSIVE SIMULATION (HES) TESTS. FOR BOTH HES AND NUCLEAR TESTS, INSTRUMENTATION TO OBTAIN THE REQUISITE DATA MUST BE ABLE TO FUNCTION PROPERLY IN THE HARSH ENVIRONMENT OF THE TESTS. INSTRUMENTATION TRADITIONALLY EMPLOYED IN S ...

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  7. QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA

    SBC: Risk Engineering Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Nuclear Regulatory Commission
  8. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1989 Nuclear Regulatory Commission
  9. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    A FEASIBILITY STUDY OF IMPROVING DECOY PENETRATION AID (PENAID) PERFORMANCE BY SUPPLYING MEANS TO 1) ALLOW FOR DUAL CENTER OF GRAVITY (CG) LOCATION, THEREBY ENABLING INDEPENDENT FULFILLMENT OF IMPULSE BALANCING AND REENTRY STABILITY REQUIREMENTS; AND/OR 2) COUNTERACT DECOY CONING BY SENSING ITS PRESENCE, AND CORRECTING THE ANGULAR MOMENTUM OF THE DECOY TO ELIMINATE CONING.

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  10. SENSITIVE LOW Z STRAIN GAGE

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government