You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Automating Communications Planning with AssuredConf
SBC: CALIOLA ENGINEERING, LLC Topic: N204A04mission planning, mission planning, resilient, RC2, OPORD, NOWS, assured, OPLAN, C2
SBIR Phase II 2021 Department of DefenseNavy -
Surface Ship Fat Line Towed Array Cut-Resistant Vibration Isolation Module (VIM) Hose
SBC: MATERIALS ENGINEERING AND TECHNICAL SUPPORT SERVICES CORP. Topic: N181034The objective of the Phase II Program under Topic N181-034 is to support the construction and transition of the improved, cut-resistant Vibration Isolation Module (VIM) hose into fleet operations. During the Phase I effort, METSS clearly demonstrated proof-of-concept designs to toughen the VIM’s outer jacket against associated forces related to high-tension, longline fishing tackle. However, the ...
SBIR Phase II 2019 Department of DefenseNavy -
Landing Signal Officer- Data Analysis Toolkit (LSO-DAT)
SBC: BGI LLC Topic: N112111The United States Navy has identified a need for a tool to assist the training of Landing SignalOfficers (LSOs) that provides visualization and analysis of data from embarked carrier landings.BGI, LLC (BGI) has proposed a solution for training LSOs by leveraging the existing CarrierVisualization After-Action Review (AAR) product to create a Landing Signal Officer-DataAnalysis Toolkit (LSO-DAT) tha ...
SBIR Phase II 2018 Department of DefenseNavy -
Analysis and Reporting Capability for Smart Aircraft Data
SBC: BGI LLC Topic: N112111The Analysis and Reporting Client (ARC) technology transitioned via this program features a common or standardized solution for analyzing and reporting on smart aircraft data. ARC can be scaled across Naval Aviation platforms by enabling access to additional data formats and either reusing existing or developing new analytics as required. ARC allows for straightforward development of platform-spec ...
SBIR Phase II 2018 Department of DefenseNavy -
Peregrine Ph II
SBC: SOAR TECHNOLOGY INC Topic: N181015SoarTech, Forward Slope, and Capt. Brian Donegan (US Navy, Retired), will develop Peregrine, a robust, ready to transition, 4D overlay generation capability. Peregrine will develop software services ready for Fleet Exercise (FLEX) exerperimentation and transition to the JMPS Multi-Vehicle Planner. Peregrine will provide air planners with services that (1) connect to, synchronize, and transform dyn ...
SBIR Phase II 2019 Department of DefenseNavy -
MMIC Coatings and Encapsulation for Non-Hermetic, Low Cost, Transmit/Receive Modules with the Reliability of Hermetic Packaging
SBC: SUNDEW TECHNOLOGIES LLC Topic: N04058The objective of this SBIR project is to develop and commercialize a protective overcoat passivation process for wafer−level sealing of Monolithic Microwave/Millimeter wave IC (MMIC). The scarce supply of hermetic packaging choices and the high cost of mil−spec integrated circuit (IC) components used in military and aerospace applications have sparked research focused on using commercial off∠...
SBIR Phase II 2005 Department of DefenseNavy -
Solution for Unmanned Underwater Vehicle Interfaces
SBC: MICHIGAN AEROSPACE CORP Topic: N04092As the Navy proceeds to update our shipboard assets through the fielding of new and innovative ship designs, the need for a modular, adaptable, multi-purpose warship becomes apparent. The Littoral Combat Ship (LCS) program is intended to field a multi-purpose, mission-adaptable combat ship for littoral near-coastal warfare, and to yield a platform ship capable of sustaining unmanned, automated sy ...
SBIR Phase II 2005 Department of DefenseNavy -
Scalable Directional Antenna for Unmanned Aerial Vehicles (UAVs)
SBC: FIRST RF CORPORATION Topic: N181064The Navy’s mission of global force projection and logistic support requires surface ships and naval aviation assets to be deployed worldwide with little supporting infrastructure for communications. Airborne units provide extended line of sight for network connectivity between surface vessels as well as contributing unique sensor capabilities. The use of unmanned aerial systems (UAS) as airborne ...
SBIR Phase II 2019 Department of DefenseNavy -
Low SWaP-C Multiple LEO Satellite Antenna
SBC: ENVISTACOM, L.L.C Topic: A16032In 2016, Envistacom was awarded a Phase I SBIR for The US Army Communications Electronics R&D Command (CERDEC) for an electronically steered antenna. The objective of that effort was to develop a robust, low cost antenna to support Blue Force Tracking (BFT3) over the Wideband Global Satellite (WGS) MILSATCOM satellite constellation. Since that time, new requirements have emerged, such as the requi ...
SBIR Phase II 2020 Department of DefenseNavy -
Automation of Analysis Model Creation
SBC: Technosoft, Inc Topic: N06T018Although numerical analysis applications have proven to be effective and reasonably accurate, the effort required to develop the associated analysis models remains a challenging and time consuming task. While many meshing tools are currently available, decomposing and manipulating the design geometry and enhancing the topology for mesh construction are manual processes and place the heaviest dema ...
STTR Phase II 2008 Department of DefenseNavy