You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Optical Link for Cryogenic FPA Readout Using Si Circuitry and Thin Film Emitters, Detectors, and Modulators

    SBC: Abj Integration Technologies,            Topic: N/A

    Standard Digital CMOS silicon circuits will have high quality Thin Film emitters, and modulators integrated on to the silicon using epitaxial liftoff and results in low cost opto-electronics in the near future. ABJ Integration is a leader in the field and proposes to design an optimized FPA readout system using this technology. Both emitters and modulators as signal sources will be investigated.

    SBIR Phase I 1995 Department of DefenseArmy
  2. Self-Lubricating Wear Resistant Advanced Materials

    SBC: Advanced Engineered            Topic: N/A

    This proposal is focused at testing a new family of intermetallic materials for superior wear resistance in automotive applications due to the self-lubricating potential of the base material at a significant reduction in operating cost and capital investment. The proposed materials are produced by a new technique resulting in uniquely superior properties. Due to the ultrafine microstructure resu ...

    SBIR Phase I 1995 Department of DefenseArmy
  3. Automated Design Tool Set for Reliability and Performance Evaluation of Fault-Tolerant Avionics Systems

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    Reliability and performance are critical characteristics of the Army's avionics systems. These systems must meet stringent requirements in the areas of: (1) dispatchability, or operational readiness to support missions; (2) dependability, or the ability to perform critical functions correctly during the duration of the mission; and (3) responsiveness, or the ability to deliver computing services a ...

    SBIR Phase II 1995 Department of DefenseArmy
  4. Field-Portable Reflective Spectrometer

    SBC: Analytical Spectral Devices,            Topic: N/A

    In this study, a design will be developed for a field-portable spectroradiometer covering the 1.0-2.5 um wavelength region utilizing line array detectors. This insturment will be used for the mreasurement of the reflectances of both man-made and natural materials using ambient solar illumination. The preliminary functional requirements for this spectrometer are as follows: wavelength range from 1. ...

    SBIR Phase II 1995 Department of DefenseArmy
  5. Noninvasive Sensor for Measuring the Partial Pressure of Oxygen in Humans

    SBC: ANHOLT TECHNOLOGIES, INC.            Topic: N/A

    The air of this proposal is to develop a noninvasive probe that may be placed near, but not on, the patient or the patient's wound, to measure the partial pressure of dissolved oxygen in the interstitial body fluids. The sensor is capable of assessing gas pressure levels in a graduated fashion from superficial to deep, in both healthy and compromised tissues. The sensitivity is sufficient to mon ...

    SBIR Phase I 1995 Department of DefenseAir Force
  6. Turbulent Drag Reduction Using Sub-Acoustic Shell Modes

    SBC: APTEK, Inc.            Topic: N/A

    A versatile, low profile actuator for incrasing aircraft performance by decreasing frictional drag is proposed. The concept dcan completely internal to the aircraft, and requires no pats, orifices, or strutures extending into the flow field which may become fouled. The Phase I effort consists of a wind tunnel experiment to determine the range of operability of the actuator. An interim effort is al ...

    SBIR Phase II 1995 Department of DefenseAir Force
  7. Acoustic Monitor for Buried Structure Detection

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  8. Protein Crystals as Patterning Elements for Nanostructured Optoelectronic Materials

    SBC: ASTRALUX, INC.            Topic: N/A

    We propose to develop a new technology for the parallel nanostructuring of optoelectronic materials. It calls for the molecular self-assembly of protein masks on a surface which has been primed with SAMs (self-assembled monolayers) which themselves have been modified, in a parallel process, by deep UV radiation. After the protein masks have been self-assembled, the process of "parallel nanometer ...

    SBIR Phase I 1995 Department of DefenseArmy
  9. Comprehensive Array Design System for Printed-Circuit Antennas

    SBC: Boulder Microwave            Topic: N/A

    We propose to develop a versatile comprehensive design system for designing printed-circuit antennas and arrays. To provide an all-encompassing design environment, the design system will provide capabilities to perform array synthesis, simulate aperture-coupled as well as proximity-coupled stacked elements in a multi-layer configuration, design the feed network, and perform accurate array analysi ...

    SBIR Phase I 1995 Department of DefenseArmy
  10. Phased Array Liquid Crystal Beamsteerer

    SBC: BOULDER NONLINEAR SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
US Flag An Official Website of the United States Government