You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMBINED SUPERCRITICAL AIR SYSTEM FOR BREATHING AND BODY COOLING

    SBC: Aerospace Design & Development, Inc.            Topic: N/A

    THE USE OF SUPERCRITICAL CRYOGENIC STORAGE OF AIR WILL PERMIT THE SUPPLY OF BREATHING AIR FOR PERSONNEL ENGAGED IN EMERGENCY OR HAZARDOUS MATERIALS ACTIVITIES. BECAUSE AIR STORAGE IS AT CRYOGENIC TEMPERATURE (LESS THAN 180 DEGREES C) THERE IS CONSIDERABLE COOLING AVAILABLE FOR THE USER AS THE AIR IS USED. THIS COMBINATION OF THE BREATING AIR SUPPLY AND PERSONNEL COOLING IS UNIQUE IN THIS DEVELOPME ...

    SBIR Phase I 1992 Department of DefenseAir Force
  2. INFLATABLE SMART MISSILE WING DESIGN EVALUATION

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  3. AN ANALYTIC-BASED SENSOR MANAGEMENT SOFTWARE PACKAGE

    SBC: Data Fusion Corporation            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  4. AN ADAPTIVE NEURAL NETWORK ANTENNA CONTROLLER WITH PERFECT MEMORY AND ONE-SHOT LEARNING

    SBC: DEVELOSOFT CORP.            Topic: N/A

    CURRENT PHASED-ARRAY CONTROL TECHNIQUES ARE UNABLE TO ADAPT TO ANTENNA DEGRADATIONS AND FAILURES TO PRODUCE AN OPTIMIZED RADIATION PATTERN. ADAPTIVE CONTROL WILL IAINIMIZE UNPREDICTED FAILURES# REDUCE MAINTENANCE COATS# SLID INCREASE MACHINE AVAILABILITY. DEVELOSOFT PROPOSES TO DESIGN# DEVELOP# AND TEST A NEURAL NETWORK ANTERMA CONTROLLER IGHICH WILL CONTINUE TO PRODUCE AIL OPTIIAAL OUTPUT RADIATI ...

    SBIR Phase I 1992 Department of DefenseAir Force
  5. IMAGE BASED OPTICAL SWITCHING

    SBC: Displaytech Incorporated            Topic: N/A

    OPTICAL SWITCHING AND INTERCONNECTS ARE OF GROWING INTEREST DUE TO THE INCREASING DEMANDS FOR HIGHER DATA RATES AND LARGER NUMBERS OF DATA CHANNELS CREATED BY ADVANCED COMPUTING AND COMMUNICATIONS SYSTEMS. FREE-SPACE OPTICAL SWITCHING AND INTERCONNECTS (SUCH AS THE IMAGE BASED SWITCH) ARE ATTRACTIVE BECAUSE OF THEIR POTENTIAL FOR LOW CROSS TALK AND LOW COMPLEXITY. DISPLAYTECH HAS EXPERIENCE WITH U ...

    SBIR Phase I 1992 Department of DefenseAir Force
  6. ADAPTIVE FLC/VLSI OPTICAL FOCAL PLANE PROCESSOR

    SBC: Displaytech Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  7. NEW HIGH-RESOLUTION CLOUD CLIMATOLOGY PRODUCTS FROM METEOROLOGICAL SATELLITES

    SBC: Metsat, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  8. ADVANCED GPS RECEIVER FOR SPACE APPLICATIONS

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    AN INNOVATIVE NEW RECEIVER ARCHITECTURE IS DESCRIBED IN THIS PROPOSAL FOR AN ADVANCED GPS RECEIVER DESIGN SUITABLE FOR SPACE APPLICATIONS. THE DESIGN ALLOWS FOR A SINGLE RECEIVER ARCHITECTURE TO BE EASILY ADAPTED FOR A VARIETY OF APPLICATIONS. THE AGR DESIGN PROPOSED INCLUDES THE CAPABILITY FOR HIGH-PRECISION SPACECRAFT NAVIGATION, TRACKING, ATTITUDE DETERMINATION, AND CAN BE EASILY ADAPTED TO IMP ...

    SBIR Phase II 1992 Department of DefenseAir Force
  9. GPS RAWINSONDE DEVELOPMENT

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    THE METEOROLOGICAL SOUNDING SYSTEM (MSS) USED BY THE NATIONAL RANGES USE A GROUND TRANSMITTING RANGING SYSTEM FOR SPACE POSITION LOCATION OF THE RADIOSONDE INSTRUMENT. SINCE THESE RADIOSONDES USE A BROAD BAND RECEIVER, MULTIPLE RADIOSONDE DEPLOYMENT AND OPERATION IN A GIVEN AREA IS NOT FEASIBLE. THESE RANGING RADIOSONDES ARE ALSO HIGHLY SUSCEPTIBLE TO INTERFERENCE FROM OTHER RF SOURCES AT, OR NEAR ...

    SBIR Phase II 1992 Department of DefenseAir Force
  10. A TRUE AIRSPEED INDICATOR BASED ON DOPPLER SHIFTED MOLECULAR LASER BACKSCATTER

    SBC: Ophir Corporation            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
US Flag An Official Website of the United States Government