You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCESS- ACCelerator for Electromagnetic Scattering Simulations

    SBC: TECH-X CORPORATION            Topic: N091023

    Determining the scattering properties of small boats on a rough sea surface is a problem of high importance to the Navy. The resulting simulations require large amounts of compute time and mechanisms are sought to accelerate them. The demand for highly realistic graphics has pushed graphics processing units (GPU) on video cards to the point where they easily outperform general purpose processors f ...

    SBIR Phase I 2009 Department of DefenseNavy
  2. A Compact CO Oxidation System

    SBC: TDA RESEARCH, INC.            Topic: N091035

    Navy aircraft is equipped with an On-Board Oxygen Generation System (OBOGS) to supply the pilot and the crew with supplemental oxygen for high altitude operation. However, Navy aircraft are usually closely spaced while waiting for take-off from aircraft carriers, and the jet engine exhaust contaminates the bleed air used to supply oxygen to the pilot and crew. Among the contaminants in the engine ...

    SBIR Phase I 2009 Department of DefenseNavy
  3. A Compact Full Motion Video and Hyperspectral Measurement System for Small Unmanned Aircraft Systems

    SBC: SPORIAN MICROSYSTEMS, INC            Topic: AF171130

    Small Unmanned Aircraft Systems (SUAS) platforms fit into the USAF Intelligence, Surveillance, and Reconnaissance strategy by providing local persistence, operation in contested environments, and low probability of detection. SUAS gimbal performance is ty

    SBIR Phase I 2017 Department of DefenseAir Force
  4. A COMPACT HEAT EXCHANGER/REACTOR FOR ENDOTHERMIC FUELS

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseAir Force
  5. Adaptive Guidance Against Maneuvering Targets for Ballistis Missile Defense

    SBC: GUIDED SYSTEMS TECHNOLOGIES, INC.            Topic: MDA07012

    Existing approaches to guidance and estimation for intercept of maneuvering targets are often dependent on assumed models of maneuvering target behavior. We have shown in Phase I that intercept lethality can be dramatically reduced when an interceptor guidance strategy optimized for a specific maneuvering target type encounters a target whose behavior differs from that of the assumed model. We th ...

    SBIR Phase II 2009 Department of DefenseMissile Defense Agency
  6. Adaptive Optics Prototype for a Meter-class Telescope used for Space Surveillance

    SBC: Guidestar Optical Systems, Inc.            Topic: AF171023

    Guidestar Optical Systems will develop a detailed design for an affordable, compact adaptive optical (AO) system which can be deployed at 1-meter class telescopes to accomplish characterization of low earth orbit objects and area inspection around high va

    SBIR Phase I 2017 Department of DefenseAir Force
  7. Adaptive Structures for Micro Munition Platforms

    SBC: COMPOSITE TECHNOLOGY DEVELOPMENT, INC.            Topic: AF081050

    The U.S. Air Force has significant interest in the development of adaptive structures for micro munition platforms.  However, power, mass and cost constraints significantly limits the applicability of existing adaptive structure concepts for these smaller platforms.  To address these challenges, CTD is proposing the use of solid-state, electrically-driven actuators that require minimal power and ...

    SBIR Phase II 2009 Department of DefenseAir Force
  8. ADVANCED ANALOG-TO-DIGITAL CONVERTER DESIGN STUDIES FOR WIDEDYNAMIC RANGE, GIGASAMPLE CONVERSION RATE, MONOLITHIC

    SBC: Q-DOT, INC.            Topic: N/A

    Q-DOT PROPOSES A VERY HIGH-SPEED (10 - 20 GS/S) MEDIUM-RESOLUTION (6-BIT) ANALOG-TO-DIGITAL CONVERTER (ADC) USING AN ADVANCED HETEROJUNCTION BIPOLAR TRANSISTOR (HBT) PROCESS. INNOVATIVE CIRCUIT DESIGN, COMBINED WITH A VERY FAST HBT PROCESS, WILL BE USED TO DESIGN A PRACTICAL WIDE BANDWIDTH CONVERTER. THE DESIGN WILL ACCOUNT FOR THE REDUCED COMPLEXITY REQUIRED BY AN EMERGING TECHNOLOGY BY USING ANA ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  9. Advanced antennas for air vehicle flight test evaluation.

    SBC: FIRST RF CORPORATION            Topic: N091041

    Through this program, FIRST RF will apply a proprietary antenna technology already in qualification for a specific Low Observable (LO) weapons system. This technology promises to dramatically reduce the cost and complexity of the design and manufacture of conformal antennas for weapons systems and other airframes. FIRST RF proposes a UHF-FTS antenna, combined S- and C-Band aperture, and a novel L- ...

    SBIR Phase I 2009 Department of DefenseNavy
  10. Advanced back-illuminated CMOS image sensors for adaptive optics applications

    SBC: SCIMEASURE ANALYTICAL SYSTEMS, INC.            Topic: AF171022

    An existing 128x128 pixel CMOS image sensor will be backthinned and anti-reflection coated with the goal of achieving a quantum efficiency of >80% at 570 nm without microlenses. Each die will be window-backthinned instead of fully backthinned and hybridiz

    SBIR Phase I 2017 Department of DefenseAir Force
US Flag An Official Website of the United States Government