You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
INCIPIENT COMBUSTION MONITOR FOR ZERO GRAVITY ENVIRONMENTS
SBC: ADA TECHNOLOGIES, INC. Topic: N/ATHE PROPOSED RESEARCH WILL INVESTIGATE THE FEASIBILITY OF USING A DYNAMIC EXPANSION CONDENSATION NUCLEI CHAMBER FOR THE DETECTION OF SUBMICROMETER PARTICLES EMITTED WHEN COMBUSTIBLE MATERIALS ARE HEATED. SUCH A DEVICE WOULD BE EMPLOYED AS THE SENSOR OF AN INCIPIENT COMBUSTION MONITOR FOR USE ON THE PROPOSED NASA SPACE STATION. COMBUSTIBLE MATERIALS EXPECTED TO BE USED IN THE CONSTRUCTION OF THE SP ...
SBIR Phase I 1990 National Aeronautics and Space Administration -
INTEGRATED MODELING TOOL FOR PERFORMANCE ENGINEERING OF COMPLEX COMPUTER SYSTEMS
SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC Topic: N/ADURING THE DEVELOPMENT OF COMPLEX COMPUTER SYSTEMS, PERFORMANCE ENGINEERING TECHNIQUES ARE OFTEN NOT APPLIED OR ARE MISAPPLIED WHICH RESULTS IN SYSTEMS THAT DO NOT MEET THESPECIFIED PERFORMANCE CRITERIA OR MUST UNDERGO COSTLY REDESIGNS. AN INTEGRATED COMPUTER SYSTEM MODELING LANGUAGE OVERCOMES THE DEFICIENCIES OR TRADITIONAL ANALYTIC AND SIMULATION MODELING TOOLS BY EXPLOITING THE STRENGTHS FROM B ...
SBIR Phase II 1987 National Aeronautics and Space Administration -
EXPERT ASSISTANT FOR INTEGRATED TIMING AND RELIABILITY DESIGN ANALYSIS
SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC Topic: N/ATIMING AND RELIABILITY PERFORMANCE ARE BECOMING INCREASINGLYCRITICAL CHARACTERISTICS OF EMBEDDED COMPUTER SYSTEM SOFTWARE. COMPLEX TRADEOFFS INVOLVING INTERACTIONS BETWEEN TIMING AND RELIABILITY PROPERTIES NEED TO BE MADE DURING DESIGN TO ENSURE THAT SYSTEMS WILL SATISFY STRINGENT PERFORMANCE REQUIREMENTS. THIS SBIR PROJECT WILL INVESTIGATE AN EXPERT SYSTEM BASED AUTOMATED TOOL TO ANALYZECOMPLEX S ...
SBIR Phase II 1990 National Aeronautics and Space Administration -
SUPERCRITICAL CRYOGENIC SELF CONTAINED BREATHING APPARATUS
SBC: Aerospace Design & Development, Inc. Topic: N/AN/A
SBIR Phase I 1990 National Aeronautics and Space Administration -
EVALUATION OF A NEW FILTER FOR MUNICIPAL AND INDUSTRIA WASTEWATER TREATMENT AMERICAN COMBUSTION, INC.
SBC: American Combustion Inc Topic: N/ATHE MAJOR OBJECTIVE OF THE RESEARCH PROPOSED IS EVALUATION OF THE TECHNICAL FEASIBILITY OF THE NEW DESIGN FEATURES OF THE FILTER AND A COMPARISON OF ITS PERFORMANCE WITH CONVEN- TIONAL FILTERS IN TREATMENT OF WASTEWATERS. THE MAJOR SPECIFIC FEATURE OF THE FILTER IS A STONE-GRANULAR MEDIA BED WHICH IS EXPECTED TO PROVIDE A NON CLOGGING OPERATION, LONGER FILTRATION RUNS AND GREATER DIRT CAPACITY THA ...
SBIR Phase I 1987 Environmental Protection Agency -
AUTOMATION OF STOWAGE- PHASE I
SBC: APTEK, Inc. Topic: N/AN/A
SBIR Phase I 1990 National Aeronautics and Space Administration -
GLOVE CONTROLLER WITH FORCE AND TACTILE FEEDBACK FOR DEXTEROUS ROBOTIC HANDS
SBC: Begej Corp. Topic: N/AN/A
SBIR Phase I 1990 National Aeronautics and Space Administration -
Superconducting Non-Contact Actuators
SBC: Blue Line Engineering Co Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Nih2 Spacecraft Batteries With Effective Performance > 100 W-Hr/Kg
SBC: BOUNDLESS CORP. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
RECOVERY OF CONTAMINANT METALS TO PERMIT RECYCLING OF DUSTS FROM ELECTRIC ARC FURNACES.
SBC: Cato Research Corpon Topic: N/AELECTRIC ARC FURNACE DUST IS LISTED AS A HAZARDOUS WASTE. TOTAL PRODUCTION OF THIS DUST IS ESTIMATED TO BE 500,000 TONS AT SOME 77 LOCATION RANGING IN SCALE FORM LESS THAN 1,000 TONS TO OVER 20,000 TONS PER YEAR. A PROCESS IS PROPOSED WHICH MAY PERMIT ON-SITE, SIMPLE RECOVERY OF CONTAMINANT METALS IN THE DUST. THE PROCESS RECYCLES RECYCLES CHEMICAL REAGENTS AND AQUEOUS LEACH , MINIMIZIN COST AND A ...
SBIR Phase I 1987 Environmental Protection Agency